The California ISO has revised the operating procedures, as referenced below.
2510A POR/POD-Scheduling Path Cross Reference, version 12.0, effective Dec. 1, 2020.
Periodic Review: Minor edit in Purpose Section, spelling out Point of Receipt/Point of Delivery (POR/POD) acronyms.
3640 Existing Transmission Contract Calculator Update, version 8.0, effective Dec. 1, 2020.
Periodic Review:
Updated section 3.2.2 Resolving Negative Available Transfer Capability (ATC).
Removed “the RC” from Operationally Affected Parties since procedure is shared with public.
Minor edits and formatting for consistency.
Removed history prior to five-years.