January 16, 2019

REQUESTED ACTION

Forward to Operating Department

CATEGORIES

Market Operations

System Operations

Notification of Revised ISO Operating Procedures 3530 and 3640

MESSAGE

The ISO has revised the operating procedures referenced below.

 

3530 Scheduling for Stranded Loads, version 8.2, effective Jan. 16, 2019

  • Multiple updates due to the implementation of the new Existing Transmission Contract Calculator (ETCC) tool
  • Replaced Peak RC (Reliability Coordinator) with the RC
  • Minor format and grammar updates

3640 Existing Transmission Contract Calculator Update, version 7.3, effective Jan. 16, 2019

  • Responsibilities Section & Sections 3.1 & 3.2: Various updates due to the implementation of the new ETCC tool
  • Replaced Peak RC with the RC
  • Minor format and grammar updates throughout
  • Removed version history prior to 5-years

ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx


CONTACT INFORMATION

ISO Procedure Control Desk at procctrldesk@caiso.com

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States