ISO Logo
 
Notice
January 16, 2020

REQUESTED ACTION

Forward to Operating Department

CATEGORIES

System Operations

Notification of Revised ISO Operating Procedures 5110, 5710 & 8110B


MESSAGE

The California ISO has revised the operating procedures referenced below.

 

5110 Real-Time Communications Guidelines, version 15.0, effective Jan. 16, 2020

Annual Review:

Minor grammar changes only.

 

5710 Certification of Metering Facilities, version 2.0, effective Jan. 16, 2020

Periodic Review:

Removed references to Meter Data Acquisition Systems Team (MDAS).

Section 3.1.3: Combined MDAS actions with Energy Data Acquisition Specialist (EDAS) actions table.

Minor format and grammar updates.

Included document control statement in footer.

 

8110B Interchange Scheduling Limits, version 10.7, effective Jan. 16, 2020

Table 1: Updated Sylmar_ITC Export to 2020 MW.

 

ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx

 


CONTACT INFORMATION

ISO Procedure Control Desk at procctrldesk@caiso.com.

 

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States