ISO Logo
 
Notice
April 1, 2021

REQUESTED ACTION

Forward to Operating Department

CATEGORIES

Operations
Notification of Revised ISO Operating Procedures 5360, 5360A, 5360B, and 5360C

MESSAGE

The California ISO has revised the operating procedure referenced below.

 

5360 Black Start Resource Testing, version 3.1, effective April 1, 2021

Responsibilities Section and Section 3.5: Clarifications of process and requirements related to Black Start testing results (submission, review, and approvals).

Operationally Affected Parties: Removed "and the Reliability Coordinator (RC)."

References: Updated North American Electric Reliability Corporation (NERC) reference.

Replaced all instances of ISO with CAISO and Blackstart with Black Start.

Minor format and grammar updates.

 

5360A Black Start Resource Test Request Form, version2.1, effective April 1, 2021

Replaced instances of ISO with CAISO and Blackstart with Black Start. Minor formatting.

 

5360B Black Start Resource Test Report Form, version 2.1, effective April 1, 2021

Updated to include resolution for frequency and voltage plots request. Replaced instances of ISO with CAISO and Blackstart with Black Start.

 

5360C Black Start Resource Test Plan Template, version 2.1, effective April 1, 2021

Replaced instances of ISO with CAISO and Blackstart with Black Start. Minor formatting.

 

ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx


CONTACT INFORMATION

ISO Procedure Control Desk at ProcedureControl@caiso.com

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States