The California ISO has revised the operating procedure referenced below.
5360 Black Start Resource Testing, version 3.1, effective April 1, 2021
Responsibilities Section and Section 3.5: Clarifications of process and requirements related to Black Start testing results (submission, review, and approvals).
Operationally Affected Parties: Removed "and the Reliability Coordinator (RC)."
References: Updated North American Electric Reliability Corporation (NERC) reference.
Replaced all instances of ISO with CAISO and Blackstart with Black Start.
Minor format and grammar updates.
5360A Black Start Resource Test Request Form, version2.1, effective April 1, 2021
Replaced instances of ISO with CAISO and Blackstart with Black Start. Minor formatting.
5360B Black Start Resource Test Report Form, version 2.1, effective April 1, 2021
Updated to include resolution for frequency and voltage plots request. Replaced instances of ISO with CAISO and Blackstart with Black Start.
5360C Black Start Resource Test Plan Template, version 2.1, effective April 1, 2021
Replaced instances of ISO with CAISO and Blackstart with Black Start. Minor formatting.
ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx