The California ISO has revised the operating procedure referenced below.
5370 Resource Performance Verification, version 7.2, effective Oct. 2, 2020.
Section 3.1.1.2.2: updated verify process for when units are on AGC.
5740 Meter Data Acquisition and Processing Procedure, version 2.0, effective Oct. 2, 2020.
Periodic Review:
Updated Review Criteria, removed Technical Review and Approval section, and added document controlled footer for consistency with other procedures.
Minor format and grammar updates.
6930 Eldorado Intertie and System (Eldorado-Moenkopi) Scheduling at Willow Beach, version 8.0, effective Oct. 2, 2020.
Periodic Review:
Removed “the RC” from Operationally Affected Parties, since this is a Public Procedure.
Updated reference to APS Path 23 procedure.
Removed version history prior to five years.
Minor format and grammar updates.
ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx