ISO Logo
 
Notice
October 2, 2020

REQUESTED ACTION

Forward to Operating Department

CATEGORIES

Operations

Notification of Revised ISO Operating Procedures 5370, 5740 and 6930

MESSAGE

The California ISO has revised the operating procedure referenced below.

  

5370 Resource Performance Verification, version 7.2, effective Oct. 2, 2020.

Section 3.1.1.2.2: updated verify process for when units are on AGC.

 

5740 Meter Data Acquisition and Processing Procedure, version 2.0, effective Oct. 2, 2020.

Periodic Review:

Updated Review Criteria, removed Technical Review and Approval section, and added document controlled footer for consistency with other procedures.

Minor format and grammar updates.

 

6930 Eldorado Intertie and System (Eldorado-Moenkopi) Scheduling at Willow Beach, version 8.0, effective Oct. 2, 2020.

Periodic Review:

Removed “the RC” from Operationally Affected Parties, since this is a Public Procedure.

Updated reference to APS Path 23 procedure.

Removed version history prior to five years.

Minor format and grammar updates.

 

ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx


CONTACT INFORMATION

ISO Procedure Control Desk at ProcedureControl@caiso.com
Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States