RC West has revised the operating procedure referenced below.
RC0120A RC West IRO-010 Data Specification, version 4.1, effective Nov. 2, 2020.
Section 2 - Added requests 2.22 and 2.23.
Section 6 - Updated 6.1 data transfer method and the ISO guidance document to include webOMS (Outage Management System) for instances such as double modeling.
Added tab for exceptions to data requests. Minor format and grammar edits.
ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx