ISO Logo
 
Notice
February 1, 2021

REQUESTED ACTION

Forward to Operating Department

CATEGORIES

Operations
Notification of Revised RC West Operating Procedure RC0430

MESSAGE

RC West has revised the operating procedures referenced below.

 

RC0430 Geomagnetic Disturbance (GMD) Operating Plan, version 2.2, effective Feb.1, 2021.

Sections 2 & 3.2: Updates made due to British Columbia Reliability Coordinator (BCRC) assuming GMD Monitor obligations from RC West as of 2/1.

Sections 3.3 & 3.5, 2nd bullet: Removed "Western Interconnection RCs" since this is no longer applicable.

Section 4: Removed RC West from list of rotating RCs.

Changes were coordinated with BCRC.

Replaced blackstart with Black Start throughout and minor grammar edit to Section 5.

 

ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx


CONTACT INFORMATION

ISO Procedure Control Desk at ProcedureControl@caiso.com

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States