ISO Logo
 
Notice
October 2, 2020

REQUESTED ACTION

Forward to Operating Department

CATEGORIES

Operations

Notification of Revised RC West Operating Procedure RC0620

MESSAGE

RC West has revised the operating procedure referenced below.

 

RC0620 Operations Planning Analysis (Next Day), version 2.0, effective Oct. 2, 2020.

Annual review (Reviewed by & coordinated with Operations Planning Working Group or OPWG):

  • Updated the Schedule Interchange input to Pre-OPA and Operations Planning Analysis (OPA).
  • Updated the Pre-OPA results posting time
  • Updated to RC West logo in header, replaced instances of ISO RC with RC West and remaining instances of the California ISO with RC West.

ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx


CONTACT INFORMATION

ISO Procedure Control Desk at ProcedureControl@caiso.com
Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States