Forward to Operating Department
RC West has revised the operating procedure referenced below.
RC0650 Steady-State and Dynamic System Model Validation: NERC MOD-033-1, version 2.1, effective June 15, 2020.
Section 4: Removed 1st responsibility bullet for Reliability Coordinator (RC), as it actually conflicts with review criteria and is not needed.
ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx
ISO Procedure Control Desk at ProcedureControl@caiso.com
Glossary of terms and acronyms
California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States
Copyright © 2020 All rights reserved