RC West has revised the operating procedures referenced below.
RC0100 Reliability Coordinator Authority, version 1.2, effective Dec. 1, 2020.
Updated Signature block for John Phipps, as Eric Schmitt has retired from the California ISO.
RC0110 Communications Protocols, version 3.0, effective Dec. 1, 2020.
Annual Review: Updated Review Criteria to include COM-002 requirements. Updated procedure references. Minor format and grammar updates.
RC0610 System Operating Limits Methodology for the Operations Horizon, version 1.2, effective Dec. 1, 2020.
Coordinated changes with Operations Planning Working Group:
Included note about system operating limits (SOLs) for generating facilities.
Provided clarification about utilization of stability limits template for communication of stability limits identified as part of seasonal studies.
Added note for Transmission Operators (TOPs) to communicate any Non-Bulk Electric System (BES) facilities that impact BES or BES facilities that should be excluded.
Included minor changes and updates to Transient Stability criteria. Minor format and grammar updates.
RC0610A Criteria for Determining Facilities Critical to Derivation of IROL, version 1.1, effective Dec. 1, 2020.
Replaced ISO RC with RC West throughout.
Added note on where the specific facilities critical to the interconnection reliability operating limit (IROL) derivation can be located.
Minor format and grammar updates.
ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx