ISO Logo
 
Notice
January 29, 2021

REQUESTED ACTION

Forward to Operating Department 

CATEGORIES

Operations
Notification of Revised RC West Operating Procedures RC0130, RC0130A and RC0680

MESSAGE

RC West has revised the operating procedures referenced below.

 

RC0130 Notification Requirements for Real-Time Events, version 1.3, effective Jan. 29, 2021.

Updated from CAISO RC to RC West.

Added RC0130A reference to Section 3.3, Item 3.3.2 and under Appendix Section.

Added note referencing RC0420 to Section 3.3, item 3.3.6.

Updated North American Electric Reliability Corporation (NERC) references.

Minor format and grammar updates for consistency.

Approved by Real-Time Working Group (RTWG).

 

RC0130A SOL Exceedance Reporting Guideline, version 1.1, effective Jan. 29, 2021.

Actual exceedance of normal Facility Ratings changed from Category 1 to 2. Clarified language in category 3.

Updated RC West procedure references.

Minor format and grammar updates for consistency.

Approved by Real-Time Working Group (RTWG).

 

RC0680 RC Guidelines For Seasonal Assessment and Coordination Process, version 1.1, effective Jan. 29, 2021.

Section 8: Replaced CAISO RC with RC West.

Updated Operationally Affected Parties to include “Publicly posted” and updated procedure footer format.

Updated NERC references.

Attachment I: Minor grammar update in first paragraph.

 

California ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx


CONTACT INFORMATION

ISO Procedure Control Desk at ProcedureControl@caiso.com

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States