ISO Logo
 
Notice
June 24, 2020

REQUESTED ACTION

Forward to Operating Department 

CATEGORIES

Operations 
Notification of Revised RC West Operating Procedures RC0140 and RC0330

MESSAGE

RC West has revised the operating procedure referenced below.

 

RC0140 Guidelines for Sending Messages Across RC Seams, version 3.0, effective June 24, 2020.

Periodic review - Removed references to 2019 transition activities. Minor format and grammar updates.

 

RC0330 Coordination with Neighboring Reliability Coordinators, version 2.0, effective June 24, 2020.

Annual Review: Replaced CAISO RC with RC West and updated to RC West logo.

Sections 3.1, 3.4, 3.4.1 & 3.4.4: Updated preferred communications methods form Reliability Coordinator Information System (RCIS) to Grid Messaging System (GMS). Section 3.4.3: Minor update to first bullet.

Other References Section: added reference to RC0140. Minor format and grammar updates.


CONTACT INFORMATION

ISO Procedure Control Desk at ProcedureControl@caiso.com

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States