ISO Logo
 
Notice
April 30, 2020

REQUESTED ACTION

Forward to Operating Department

CATEGORIES

Operations
Notification of Revised RC West Operating Procedures RC0550 and RC0620 Update

MESSAGE

RC West has revised the operating procedures referenced below.

 

RC0550 Reliability Coordinator Procedure Development, Maintenance and Distribution, version 1.1, effective April 30, 2020.

Updated to RC West logo and replaced CAISO RC with RC West throughout.

Section 1.12: Minor edits to bullets 2 and 4.

 

RC0620 Operations Planning Analysis (Next Day), version 1.1, effective April 30, 2020.

Update to Section 3.3 to remove BPM link and include that the request should be via Customer Inquiry, Dispute and Information (CIDI).

Changed CAISO RC to RC West throughout document.

 


CONTACT INFORMATION

ISO Procedure Control Desk at procctrldesk@caiso.com

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States