RC West has revised the operating procedures referenced below.
RC0600 RC West Implementation of Common Interconnection-wide Methodology, version 2.0, effective Jan. 1, 2021.
Annual Review: Minor correction of procedure reference at the end of Section 3.4. Minor format and grammar updates.
RC0600A Western Interconnection Modeling and Monitoring Common Methodology, version 2.0, effective Jan. 1, 2021.
Annual Review:
Identified changes to Section 2.1.3, a few formatting changes and recommended deletion of Appendix A. In addition, the Methodology was classified as a “Public” document, included RC West procedure reference in header, minor format and grammar updates.
California ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx