RC West has revised the operating procedure referenced below.
RC0310 Mitigating SOL and IROL Exceedances, version 1.7, effective May 15, 2022.
Section 3.5: Added bullet and sub-bullets for a Voltage Stability exceedance.
Updated North American Electric Reliability Corporation (NERC) Standard references and minor format and grammar updates throughout.
Added procedure references to procedures RC0310A and RC0310B in References section.
The California ISO’s operating procedures are available on the Operating Procedures webpage.