ISO Logo
 
Notice
May 3, 2022

REQUESTED ACTION

Forward to the Operating Department

CATEGORIES

Operations

Notification of Revised RC West Operating Procedures RC0120A, RC0120B and RC0120C


MESSAGE

RC West has revised the operating procedures referenced below.

 

RC0120A RC West IRO-010 Data Specification, version 5.2, effective May 3, 2022

Annual Review: Added exceptions to data requests.

 

RC0120B RC West IRO-010 Data Specification for Adjacent RCs, version 4.2, effective May 3, 2022

Annual Review:   Added exceptions to data requests in coordination with Tucson Electric Power (TEPC). Clarified language in data request 6.24.

 

RC0120C ICCP or PMU Data Request Procedure, version 3.1, effective May 3, 2022

Annual Review:

References: Updated North American Electric Reliability Corporation (NERC) Standard and removed reference to CAISO IRO-010 RC Data Specifications since detail now in CAISO Operating Procedure 3140A also referenced.

Definitions Section: Updated from ISO to CAISO.

 

 

The California ISO’s operating procedures are available on the Operating Procedures webpage.


CONTACT INFORMATION

ISO Procedure Control Desk at ProcedureControl@caiso.com.

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States