ISO Logo
 
Notice
April 16, 2020

REQUESTED ACTION

Forward to Operating Department

CATEGORIES

Operations

Notification of Revised ISO Operating Procedure 5330

MESSAGE

The California ISO has revised the operating procedure referenced below.

 

5330 Resource Testing Guidelines, version 12.0, effective April 16, 2020.

Periodic Review:

Section 3.1.1: For “Non-Spinning Reserve Testing” removed (zero RPM (Revolutions Per Minute)), as it is not necessary; other minor updates including Reliability Must-Run (RMR) Unit Capacity procedure reference.

Section 3.4: Updated note in beginning.

Section 3.5, Scheduling Coordinator Tasks: Minor update to Step 5.

Minor format and grammar updates.

Removed version history prior to 5-years.


CONTACT INFORMATION

ISO Procedure Control Desk at procctrldesk@caiso.com

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States