ISO Logo
 
Notice
October 31, 2019

REQUESTED ACTION

Forward to Operating Department

CATEGORIES

System Operations

Reliability Coordinator

Notification of Revised ISO RC West Operating Procedures RC0120, RC0120A, RC0120B, RC0120C, RC0140, RC0310, RC0320, RC0610 and RC0630

MESSAGE

The California ISO has revised the operating procedure referenced below.

 

RC0120 Guidelines for RC West IRO-010 Data Specification and Collection, version 2.1, effective Nov. 1, 2019

URGENT UPDATE for 11/1 –

Section 3.1.5.5 – req # 5.7-5.9 updated list included in the Path Limit Calculator (PLC) tool

Added references to new appendix RC0120C.

 

RC0120A RC IRO-010 Data Specification, version 2.1, effective Nov, 1, 2019

URGENT CHANGE for 11/1 - See yellow highlights in document: Section 5 - 5.7-5.9 - Changed submission method from webOMS to PLC, effective date of 11/1/2019, and CAISO guidance documents to include RC0630, RC0630A, and RC0130. Added West (RC West) to title to be consistent with RC0120B.

 

RC0120B RC West IRO-010 Data Specification for Adjacent RCs, version 2.0, effective Nov. 1, 2019

Added Southwest Power Pool (SPP) and British Columbia Reliability Coordinator (BCRC) for comparison; RC West added 3.4 and 3.6.

 

RC0120C ICCP Data Request Procedure, version 1.0, effective Nov. 1, 2019

New Procedure Attachment created.

 

RC0140 Guidelines for Sending Messages Across RC Seams, version 2.0, effective Nov. 1, 2019

Updated for Nov. 1 release (Minor formatting and grammar updates along with RC West Logo).

 

RC0310 Mitigating SOL and IROL Exceedances, version 1.4, effective Nov. 1, 2019

Minor updates for 11/1, replaced all CAISO RC references to RC West. Approved by Reliability Coordinator Real-Time Working Group (RTWG) on 06/21/19.

 

RC0320 Outage Review and Coordination, version 1.2, effective Nov. 1, 2019

Updated to include NW Pacific Conference call. Replaced CAISO RC with RC West throughout.

 

RC0610 System Operating Limits Methodology for the Operations Horizon, version 1.1, effective Nov. 1, 2019.

Updated to RC West logo, replaced CAISO RC with RC West and replaced CAISO RC site to RC West portal.

Removed Appendix F and replaced reference to Appendix with reference to RC0680.

 

RC0630 Outage Coordination Process, version 1.1, effective Nov. 1, 2019.

Section 12.4: Updated time to 1400 PPT.

Section 12: Updated first paragraph.

Replaced CAISO RC with RC West.

Minor grammar and format updates.

 

ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx


CONTACT INFORMATION

ISO Procedure Control Desk at procctrldesk@caiso.com

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States