ISO Logo
 
Notice
January 6, 2021

REQUESTED ACTION

Forward to Operating Department

CATEGORIES

Operations

Notification of Revised ISO Operating Procedure 2720


MESSAGE

The California ISO has revised the operating procedure referenced below.

 

2720 Market Disruption – EIM, version 4.0, effective Jan. 6, 2021

  • Periodic Review - Major Update: Updated with items developed in coordination with Energy Imbalance Market (EIM) Entities in the Market Disruption Workshop.
  • Major rewrite to entire Section 3: Added detailed Scenarios to each Tier with the actions of the Real-Time Market Operator (RTMO) and options of the EIM Operator. Added Tariff/BPM, Pricing, RTMO/EIM Tools and Communication Types details (Highlighted only Section headings). Updated ISO References to CAISO. Minor format and grammar updates.

 

ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx


CONTACT INFORMATION

ISO Procedure Control Desk at ProcedureControl@caiso.com
Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States