ISO Logo
 
Market Notice
February 15, 2019

REQUESTED ACTION

Forward to Operating Department

CATEGORIES

Market Operations

System Operations

Notification of Revised ISO Operating Procedure 2510A


MESSAGE

The California ISO has revised the operating procedure referenced below.

 

2510A POR/POD-Scheduling Path Cross Reference, version 11.12, effective Feb. 15, 2019.

Corrected typo in version history for version 11.11 (correction is highlighted).

Changed Intertie Constraint for Bonneville Power Administration (BPA) from MALIN500 to MALIN500_ISL due to name change in the new Existing Transmission Contract Calculator (ETCC).

Minor format and grammar updates.

 

ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx


CONTACT INFORMATION

ISO Procedure Control Desk at procctrldesk@caiso.com

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts
Subscribe

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States