The California ISO has revised the operating procedure referenced below.
2510A POR/POD-Scheduling Path Cross Reference, version 11.12, effective Feb. 15, 2019.
Corrected typo in version history for version 11.11 (correction is highlighted).
Changed Intertie Constraint for Bonneville Power Administration (BPA) from MALIN500 to MALIN500_ISL due to name change in the new Existing Transmission Contract Calculator (ETCC).
Minor format and grammar updates.
ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx