ISO Logo
 
Notice
July 17, 2019

REQUESTED ACTION

Forward to Operating Department

CATEGORIES

System Operations

Notification of Revised ISO Operating Procedure 4100

MESSAGE

The California ISO has revised the operating procedure referenced below.

 

4100 System Operations Emergency Plan, version 9.0, effective July 18, 2019

Annual Review:

Replaced all instances of Reliability Messaging Tool (RMT) with Reliability messaging system.

Minor format and grammar updates.

Added document control statement in footer.

 

ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx


CONTACT INFORMATION

ISO Procedure Control Desk at procctrldesk@caiso.com

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States