5 Congestion Revenue Rights
Congestion revenue rights auction efficiency 1B became effective on January 1, 2019. It includes key changes related to the congestion revenue rights settlements process:
- Targeted reduction of congestion revenue rights payouts on a constraint by constraint basis.
- Distribute congestion revenues to the extent that CAISO collected the requisite revenue on the constraint over the month. That is, implement a pro-rata funding for CRRs.
- Allow surpluses on one constraint in one hour to offset deficits on the same constraint in another hour over the course of the month.
- Only distribute surpluses to congestion revenue rights if the surplus is collected on a constraint that the congestion revenue right accrued a deficit, and only up to the full target payment value of the congestion revenue right.
- Distribute remaining surplus revenue at the end of the month, which are associated with constraints that collect more surplus over the month than deficits, to measured demand.
Monthly CRR Revenue
Figure 11 illustrates the daily CRR notional value in the corresponding month for the various transmission elements that experienced congestion during the month. CRR notional value is calculated as the product of CRR implied flow (MW) and constraint shadow price ($/MWh) in each hour per constraint and CRR.
Figure 11: Daily CRR Notional Value by Transmission Element

Figure 12 illustrates the daily CRR offset value in the corresponding month for the transmission elements that experienced congestion during the month. CRR offset value is the difference between the revenue collected from the congestion and the CRR notional value. A positive CRR offset value represents surplus and a negative CRR offset value represents shortfall.
As shown below, table 6 shows the percentage of monthly CRR deficit by transmission element and Table 7 shows the percentage of monthly CRR surplus by transmission element.
Figure 12: Daily CRR Offset Value by Transmission Element

Constraint | Percent |
---|---|
30040_TESLA _500_30050_LOSBANOS_500_BR_1 _1 | 32.58 |
OMS_14369435_Miguel_BK80 | 13.17 |
30055_GATES1 _500_30060_MIDWAY _500_BR_1 _1 | 12.99 |
Other | 9.87 |
24801_DEVERS _500_24804_DEVERS _230_XF_2 _P | 9.64 |
OMS_14196980 MAG_PAST3+PAST-PARD | 8.41 |
22886_SUNCREST_230_22885_SUNCREST_500_XF_2 _P | 4.50 |
24114_PARDEE _230_24128_S.CLARA _230_BR_1 _1 | 2.83 |
SYLMAR-AC_BG_NG | 2.22 |
OMS 14384680_50001_OOS_NG | 1.93 |
30790_PANOCHE _230_30900_GATES _230_BR_2 _1 | 1.87 |
Constraint | Percent |
---|---|
30750_MOSSLD _230_30797_LASAGUIL_230_BR_1 _1 | 26.83 |
MALIN500_ISL | 20.23 |
33535_SFWY_TP2_115_33549_GWFTRACY_115_BR_2 _1 | 14.84 |
HUMBOLDT_EXP_NG_50 | 9.67 |
Other | 8.86 |
NOB_ITC | 7.98 |
MONAIPPDC_ITC | 4.79 |
33543_AEC_TP2 _115_33540_TESLA _115_BR_1 _1 | 2.06 |
OMS_13160415_WHIRLWIND_XF | 1.83 |
33010_SOBRANTE_115_30540_SOBRANTE_230_XF_2 | 1.50 |
NdGrp: 24787_POOLE _55_B2 | 1.42 |
The main reasons for CRR offset shortfall were
- The line 30040_TESLA _500_30050_LOSBANOS_500_BR_1 _1 was binding on 22 days of this month, resulting in offset shortfall of $4.30 million.
- The nomogram OMS_14369435_Miguel_BK80 was binding on 3 days of this month, resulting in offset shortfall of $1.75 million.
- The line 30055_GATES1 _500_30060_MIDWAY _500_BR_1 _1 was binding on 25 days of this month, resulting in offset shortfall of $1.72 million.
The main reasons for CRR offset surplus were
- The line 30750_MOSSLD _230_30797_LASAGUIL_230_BR_1 _1 was binding on 18 days of this month, resulting in offset surplus of $1.05 million.
- The intertie MALIN500_ISL was binding on 2 days of this month, resulting in offset surplus of $0.79 million.
- The line 33535_SFWY_TP2_115_33549_GWFTRACY_115_BR_2 _1 was binding on 17 days of this month, resulting in offset surplus of $0.58 million.
Table 8 shows the percentage of monthly CRR payment by transmission element.
Constraint | Percent |
---|---|
30040_TESLA _500_30050_LOSBANOS_500_BR_1 _1 | 38.07 |
30055_GATES1 _500_30060_MIDWAY _500_BR_1 _1 | 16.46 |
Other | 13.12 |
OMS_14369435_Miguel_BK80 | 8.11 |
SYLMAR-AC_BG_NG | 7.10 |
24801_DEVERS _500_24804_DEVERS _230_XF_2 _P | 5.80 |
22886_SUNCREST_230_22885_SUNCREST_500_XF_2 _P | 2.86 |
30750_MOSSLD _230_30797_LASAGUIL_230_BR_1 _1 | 2.84 |
OMS_14196980 MAG_PAST3+PAST-PARD | 2.29 |
OMS_14291578_SUNCREST BK80_NG | 1.74 |
7720F_JHINDS_ALIS_NG | 1.62 |
Table 9 shows the monthly CRR statistics. The Net Monthly Balancing Surplus calculates as CRR Surplus plus CRR Daily Balancing Account minus total auction revenue. The total auction revenue is the sum of Monthly Auction Revenue and Annual Auction Revenue. The Allocation to Measured demand is calculated as sum of total auction revenue and Net Monthly Balancing Surplus.
Net Monthly Balancing Surplus in November was -$1.62 million. The auction revenues credited to the balancing account for November were $7.46 million. As a result, the balancing account had a surplus of approximately $5.85 million compared to $33.50 million in the previous month, which was allocated to measured demand.
Description | NOVEMBER -2023 | OCTOBER -2023 |
---|---|---|
CRR Notional Value | $48,638,792 | $63,695,884 |
CRR Deficit | -$13,156,487 | -$15,614,432 |
CRR Settlement Rule | -$462 | -$577 |
CRR Adjusted Payment | $35,481,843 | $48,080,874 |
CRR Surplus | $3,898,732 | $28,587,647 |
Monthly Auction Revenue | $5,369,340 | $5,763,317 |
Annual Auction Revenue | $2,095,416 | $2,171,590 |
CRR Daily Balancing Account | $1,949,332 | $4,916,868 |
Net Monthly Balancing Surplus | -$1,616,692 | $25,569,608 |
Allocation to Measured Demand | $5,848,064 | $33,504,515 |