ISO Logo
 
Notice
August 12, 2020

REQUESTED ACTION

Forward to Operating Department 

CATEGORIES

Operations

Notification of Revised ISO Operating Procedures 2510, 2510A, 2510B, and 4410D


MESSAGE

The California ISO has revised the operating procedures referenced below.

 

2510 NERC Tagging Requirements, version 9.1, effective Aug. 12, 2020.

Remove “the RC” from Operationally Affected Parties.

Appendix: Added 2510C Allowable Tag and Market Award Combinations.

Minor format and grammar updates.

 

2510A POR/POD-Scheduling Path Cross Reference, version 11.13, effective Aug. 12, 2020.

Added Harry Allen 500 kV line and removed history prior to five years.

 

2510B ISO Tagging Templates, version 1.1, effective Aug. 12, 2020.

Added Harry Allen 500 kV (HA500).

 

4410D Emergency Assistance Resource IDs, version 3.6, effective Aug. 12, 2020.

Added HA500 RESID’s for Harry Allen 500 kV.

 

ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx


CONTACT INFORMATION

ISO Procedure Control Desk at ProcedureControl@caiso.com

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States