ISO Logo
 
Notice
October 28, 2021

REQUESTED ACTION

Forward to Operating Department

CATEGORIES

Operations
Notification of Revised ISO Operating Procedures 4110, 4110A and 5110

MESSAGE

The California ISO has revised the operating procedures referenced below.

 

4110 Operations Emergency Preparation Notifications and Reporting, version 10.0, effective Oct. 28, 2021.

Periodic Review:

  • Updated from ISO to CAISO throughout.
  • Updated North American Electric Reliability Corporation (NERC) EOP-004 references.
  • Minor formatting and grammar updates.

 

4110A DOE, NERC and WECC Significant Event Reporting Requirements, version 8.0, effective Oct. 28, 2021.

Periodic Review:

  • Added new #2 & #14 to the Events that Require Department of Energy (DOE) OE-417 Report section and updated various language to match DOE Report form.
  • Updated from ISO to CAISO and removed history prior to five-years.
  • Minor formatting and punctuation edits.

 

5110 Real-Time Communications Guidelines, version 17.0, effective Oct. 28, 2021.

Annual Review:

  • Section 3.6: added Note.
  • Updated references to NERC Standard TOP-001.
  • Replaced Reliability messaging system with Grid Messaging System (GMS).
  • Minor grammar and format updates.

 

The ISO’s operating procedures are available on the Operating Procedures webpage.


CONTACT INFORMATION

ISO Procedure Control Desk at ProcedureControl@caiso.com
Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States