ISO Logo
 
Notice
February 12, 2021

REQUESTED ACTION

Forward to Operating Department

CATEGORIES

Operations
Notification of Revised ISO Operating Procedures 1210 and 2510

MESSAGE

The California ISO has revised the operating procedures referenced below.

 

1210 Day-Ahead Market, version 18.5, effective Feb. 12, 2021

Updated references of ISO to CAISO.

Section B.3.1.1: Clarified between Legacy and Non-Legacy Reliability-Must-Run (RMR) Manual Dispatch.

Section B.3.1.2: Removed most content (Retired Day-Ahead EverBridge dispatch process for Condition 1 RMR with Must Offer Obligations (MOO), as it is no longer in use) and included with Section B.3.1.1.

Section B.3.1.3: Removed this section of Real-Time activities from this Day-Ahead procedure (See 2310 for Real-Time activities).

Minor format and grammar updates.

 

2510 NERC Tagging Requirements, version 9.2, effective Feb. 12, 2021

Section 3.1.3: Changes to tag submission timing for Intertie Deviation Settlement (IDS) implementation.

References: Updated North American Electric Reliability Corporation (NERC)/ Western Electricity Coordinating Council (WECC) Standards, removed those retired.

Replaced ISO with CAISO in most instances throughout.

Minor format and grammar updates.

 

ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx


CONTACT INFORMATION

ISO Procedure Control Desk at ProcedureControl@caiso.com
Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States