The California ISO has revised the operating procedures referenced below.
1210 Day-Ahead Market, version 18.5, effective Feb. 12, 2021
Updated references of ISO to CAISO.
Section B.3.1.1: Clarified between Legacy and Non-Legacy Reliability-Must-Run (RMR) Manual Dispatch.
Section B.3.1.2: Removed most content (Retired Day-Ahead EverBridge dispatch process for Condition 1 RMR with Must Offer Obligations (MOO), as it is no longer in use) and included with Section B.3.1.1.
Section B.3.1.3: Removed this section of Real-Time activities from this Day-Ahead procedure (See 2310 for Real-Time activities).
Minor format and grammar updates.
2510 NERC Tagging Requirements, version 9.2, effective Feb. 12, 2021
Section 3.1.3: Changes to tag submission timing for Intertie Deviation Settlement (IDS) implementation.
References: Updated North American Electric Reliability Corporation (NERC)/ Western Electricity Coordinating Council (WECC) Standards, removed those retired.
Replaced ISO with CAISO in most instances throughout.
Minor format and grammar updates.
ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx