The California ISO has revised the operating procedures referenced below.
3140A TOP-003 TOP - BA Data Request and Specifications for Data Provision, version 2.1, effective Jan. 31, 2019.
- Updated 2.21 to change responsible entity from Balancing Authority (BA) to Generator Operator (GOP).
- Updated 5.1 and 5.4 to change data transfer method to Update Outage Management System (OMS), phone call is a courtesy.
- Replaced NEV with NVE (NV Energy) under Operationally Affected Parties.
4110 Operations Emergency Preparation Notifications and Reporting, version 9.1, effective Jan. 31, 2019.
- Section 3.1.2: Removed all but first bullet for clarity and consistency and added detail to time frame for reporting.
- Section 3.1.3, Step 1: Removed seventh bullet (Prior to taking a unit off line or placing a unit on line), as it is no longer applies.
- Minor format and grammar updates.
5510 Procedure Development, Maintenance and Distribution, version 5.0, effective Jan. 31, 2019.
- Changed title of the procedure and combined content with procedures 5510, 5520, 5520A, 5520B, 5520C, 5530 procedures.
- Removed the term “Interim Operating Instruction”, removed references to combined procedures throughout and removed technical review and approval sections.
- Format and grammar updates throughout.
ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx