ISO Logo
 
Market Notice
January 31, 2019

REQUESTED ACTION

Forward to Operating Department

CATEGORIES

Market Operations

System Operations

Notification of Revised ISO Operating Procedures 3140A, 4110 and 5510

MESSAGE

The California ISO has revised the operating procedures referenced below.

 

3140A TOP-003 TOP - BA Data Request and Specifications for Data Provision, version 2.1, effective Jan. 31, 2019.

  • Updated 2.21 to change responsible entity from Balancing Authority (BA) to Generator Operator (GOP).
  • Updated 5.1 and 5.4 to change data transfer method to Update Outage Management System (OMS), phone call is a courtesy.
  • Replaced NEV with NVE (NV Energy) under Operationally Affected Parties.

4110 Operations Emergency Preparation Notifications and Reporting, version 9.1, effective Jan. 31, 2019.

  • Section 3.1.2: Removed all but first bullet for clarity and consistency and added detail to time frame for reporting.
  • Section 3.1.3, Step 1: Removed seventh bullet (Prior to taking a unit off line or placing a unit on line), as it is no longer applies.
  • Minor format and grammar updates.

5510 Procedure Development, Maintenance and Distribution, version 5.0, effective Jan. 31, 2019.

  • Changed title of the procedure and combined content with procedures 5510, 5520, 5520A, 5520B, 5520C, 5530 procedures.
  • Removed the term “Interim Operating Instruction”, removed references to combined procedures throughout and removed technical review and approval sections.
  • Format and grammar updates throughout.

ISO Operating Procedures - http://www.caiso.com/rules/Pages/OperatingProcedures/Default.aspx

 


CONTACT INFORMATION

ISO Procedure Control Desk at procctrldesk@caiso.com

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States