1 Market Characteristics

Loads

Figure 1 shows system peak load. Peak loads for ISO area were above 42,000 MW in the first nine days of this month due to the heat wave with peak load exceeding 50,000 MW on September 6.

Figure 1: System Peak Load

System Peak Load