Interconnection Process Enhancements 2023 Track 2: Revised 2024 Generator Interconnection Data posted
|
Legal and regulatory, Planning |
10/04/2024, 12:00 AM |
New initiative: Congestion Revenue Rights Enhancements, working group meeting on 11/14/24
|
Markets |
10/04/2024, 12:00 AM |
California ISO to distribute penalty proceeds and nonrefundable interconnection funds
|
Legal and regulatory, Markets |
10/04/2024, 12:00 AM |
Annual Review: ISO Compliance with Operations Policies and Procedures
|
Legal and regulatory, Markets, Operations, Governance and committees |
10/04/2024, 12:00 AM |
2024 adjustment of the emergency interconnection network upgrade maximum is posted
|
Planning |
10/03/2024, 12:00 AM |
2024 and 2025 adjusted Reliability Network Upgrade Reimbursement Limits
|
Planning |
10/03/2024, 12:00 AM |
2025 Final Effective Flexible Capacity values for Resource Adequacy Resources posted
|
Markets, Operations |
10/03/2024, 12:00 AM |
Storage Bid Cost Recovery and Default Energy Bids Enhancements: Draft final proposal, call on 10/9/24
|
Markets |
10/02/2024, 12:00 AM |
Notification of revised ISO operating procedure 5210A
|
Operations |
10/01/2024, 12:00 AM |
ISO Board of Governors, DMM Oversight Committee and Audit Committee meetings on 10/4/24; final agendas posted
|
Markets, Governance and committees |
10/01/2024, 12:00 AM |
Notification of revised RC West operating procedures RC0310, RC0410A, RC0430A and RC0460F
|
Operations |
10/01/2024, 12:00 AM |
BPM change management: Proposed revision requests and updated BPMs posted as of 10/1/24
|
Legal and regulatory |
10/01/2024, 12:00 AM |
Cluster 15 Interconnection Request Resubmission Window Open and GRIP is live
|
Planning |
10/01/2024, 12:00 AM |
Generator Interconnection Process Information posted
|
Planning |
09/30/2024, 12:00 AM |
Summer Market Performance Report for August 2024 posted
|
Markets |
09/30/2024, 12:00 AM |
Interconnection Process Enhancements 2023: Track 2 Tariff Revisions Posted, call on 10/10/24
|
Legal and regulatory, Markets, Operations |
09/30/2024, 12:00 AM |
ISO Board of Governors, DMM Oversight Committee and Audit Committee meetings on 10/4/24; draft agendas posted
|
Markets, Governance and committees |
09/27/2024, 12:00 AM |
Notice of new market participant as of 9/26/24
|
Markets |
09/26/2024, 12:00 AM |
EDAM Access Charge Application for ISO BAA Participation Rules: Draft tariff language call on 10/7/24
|
Markets |
09/26/2024, 12:00 AM |
Transmission Service and Market Scheduling Priorities Phase 2 track 3 webinar training session on 10/2/24
|
Legal and regulatory, Markets, Operations |
09/25/2024, 12:00 AM |
115 kV Lines Derate in Southern California Edison area, effective 9/25/24
|
Markets, Operations |
09/24/2024, 12:00 AM |
Interconnection Process Enhancements 2023 Track 2: 2024 Generator Interconnection Data posted
|
Legal and regulatory, Planning |
09/24/2024, 12:00 AM |
Western Energy Markets Regional Issues Forum on 10/29/24; registration requested
|
Markets, Governance and committees |
09/23/2024, 12:00 AM |
New to CAISO.com the Points of Interconnection Heatmap
|
Markets, Operations |
09/20/2024, 12:00 AM |
Inter-SC Trades in Regional Markets: Draft tariff language posted, call on 10/10/24
|
Markets |
09/20/2024, 12:00 AM |
California ISO Draft 2025 Payments Calendar posted
|
Markets |
09/20/2024, 12:00 AM |
Western Energy Markets Governing Body and Joint Meetings in Tempe, Arizona 9/25/24-9/26/24; final agendas posted
|
Markets, Governance and committees |
09/20/2024, 12:00 AM |
Customer Partnership Group for Congestion Revenue Rights upgrade project call on 9/26/24
|
Markets |
09/19/2024, 12:00 AM |
Allocation of Disgorged Funds from Two FERC Enforcement Settlement Agreements
|
Legal and regulatory, Markets |
09/18/2024, 12:00 AM |
Western Energy Markets Governing Body and Joint Meetings in Tempe, Arizona 9/25/24-9/26/24; draft agendas posted; registration requested
|
Markets, Governance and committees |
09/18/2024, 12:00 AM |
Resource Adequacy Modeling and Program Design hybrid working group on 10/8/24
|
Markets |
09/17/2024, 12:00 AM |
Final 2025 Net Qualifying Capacity values for Resource Adequacy Resources posted
|
Markets, Operations |
09/17/2024, 12:00 AM |
Business Practice Manual Change Management call on 9/24/24
|
Legal and regulatory, Markets |
09/17/2024, 12:00 AM |
Enhancement to the Maximum Import bid Price logic to be presented, Market Performance and Planning Forum on 9/18/24
|
Markets |
09/16/2024, 12:00 AM |
Greenhouse Gas Coordination: Price Formation Evergreen Training posted
|
Markets |
09/16/2024, 12:00 AM |
Announced Resource Retirement and Mothball List posted
|
Planning |
09/12/2024, 12:00 AM |
Notice of new market participants as of 9/12/24
|
Markets |
09/12/2024, 12:00 AM |
Update: Greenhouse Gas Coordination working group on 9/19/24 moved to virtual-only
|
Markets |
09/12/2024, 12:00 AM |
Notification of revised RC West operating procedure RC0670
|
Operations |
09/12/2024, 12:00 AM |
Notification of revised ISO operating procedures 3320 and 3610
|
Operations |
09/12/2024, 12:00 AM |
Section 43A.6.3 Report of Non-Resource Adequacy Capacity for August 2024
|
Legal and regulatory, Markets |
09/10/2024, 12:00 AM |
Scheduling Coordinator Self-Audit Attestation and Settlement Quality Meter Data Affirmation, due 10/31/24
|
Markets |
09/10/2024, 12:00 AM |
Penalty Enhancements Demand Response Investigation and Tolling: Draft final proposal with redlines posted
|
Markets |
09/09/2024, 12:00 AM |
2025 Annual Acquired Resource Notification
|
Legal and regulatory, Markets |
09/09/2024, 12:00 AM |
Adjustment Details for T+11M, T+21M, T+24M, T+33M Recalculation Settlement Statements
|
Markets |
09/09/2024, 12:00 AM |
Generator Interconnections 2024 Non-Refundable Funds Distribution
|
Legal and regulatory, Markets |
09/06/2024, 12:00 AM |
Price Formation Enhancements Discussion paper and stakeholder recommendations posted, call on 9/30/24
|
Markets |
09/06/2024, 12:00 AM |
Western Energy Markets Regional Issues Forum on 9/27/24, final agenda posted
|
Markets, Governance and committees |
09/06/2024, 12:00 AM |
Billing, Payment and Credit Enhancements: Draft tariff language posted, call on 9/19/24
|
Legal and regulatory, Markets |
09/05/2024, 12:00 AM |
Inter-SC Trades in Regional Markets: Draft final proposal posted; call on 9/11/24
|
Markets |
09/05/2024, 12:00 AM |
Notice of new market participant as of 9/5/24
|
Markets |
09/05/2024, 12:00 AM |
Resource Adequacy Modeling and Program Design: Stakeholder survey regarding working group process, due 10/4/24
|
Markets |
09/05/2024, 12:00 AM |
Interconnection Process Enhancements 2023: Comments on Track 3A working group meetings accepted until 9/18/24.
|
Markets, Operations, Planning |
09/04/2024, 12:00 AM |
Storage Bid Cost Recovery and Default Energy Bids Enhancements: Revised straw proposal posted, call on 9/11/24
|
Markets |
09/04/2024, 12:00 AM |
Resource Interconnection Standards Fair: Draft presentation posted, hybrid meeting on 9/17/24
|
Legal and regulatory, Markets, Planning |
09/04/2024, 12:00 AM |
Greenhouse Gas Coordination: Hybrid working group on 9/19/24
|
Markets |
09/04/2024, 12:00 AM |
2024-2025 Transmission Planning Process, hybrid two-day meeting on 9/23/24 and 9/24/24
|
Planning |
09/03/2024, 12:00 AM |
Cluster 15 Application Resubmission Window Opening 10/1/24
|
Legal and regulatory, Operations, Planning |
09/03/2024, 12:00 AM |
Interconnection Process Enhancements 2023 Track 2: 2024 Interconnection Data posted
|
Legal and regulatory, Planning |
08/30/2024, 12:00 AM |
Summer Market Performance Report for July 2024 posted
|
Markets |
08/30/2024, 12:00 AM |
Information on transmission capability estimate inputs for the CPUC integrated resource planning posted
|
Legal and regulatory, Planning |
08/30/2024, 12:00 AM |
Notice of new market participant as of 8/29/24
|
Markets |
08/29/2024, 12:00 AM |
Notice of new market participant as of 8/27/24
|
|
08/28/2024, 12:00 AM |
New Heterogeneous Distributed Energy Resource type to support underlying Distributed Energy Resources and Distributed Curtailment Resources training on 9/12/24
|
Markets |
08/28/2024, 12:00 AM |
BPM change management: Proposed revision requests and updated BPMs posted as of 8/27/24
|
Legal and regulatory |
08/27/2024, 12:00 AM |
Notice of new market participants as of 8/23/24
|
Markets |
08/26/2024, 12:00 AM |
Publication of Unscheduled Directed Recalculation Settlement Statements
|
Markets |
08/22/2024, 12:00 AM |
Interconnection Process Enhancements 2023: Track 3A working group meetings scheduled, virtually on 8/28/24 and hybrid on 9/4/24
|
Markets, Operations, Planning |
08/21/2024, 12:00 AM |
Notice of new market participant as of 8/21/24
|
|
08/21/2024, 12:00 AM |
Registration Open - Market Performance and Planning Forum Hybrid Meeting on 9/18/24
|
Legal and regulatory, Markets |
08/20/2024, 12:00 AM |
Registration open: Market Performance and Planning Forum, hybrid meeting on 9/18/24
|
Markets, Information Technology |
08/20/2024, 12:00 AM |
2025 Annual import allocation process: Step 13 remaining import capability posted
|
Markets |
08/16/2024, 12:00 AM |
2025 Effective Flexible Capacity values for Resource Adequacy Resources posted
|
Markets, Operations |
08/16/2024, 12:00 AM |
2024-2025 Transmission Planning Process: Preliminary Results posted, request window open
|
Planning |
08/16/2024, 12:00 AM |
2025 Net Qualifying Capacity values for Resource Adequacy Resources posted
|
Markets, Operations |
08/16/2024, 12:00 AM |
Customer Partnership Group for Congestion Revenue Rights upgrade project call on 8/22/24
|
Markets |
08/15/2024, 12:00 AM |
Notice of new market participant as of 8/15/24
|
Markets |
08/15/2024, 12:00 AM |
Registration reminder: Resource Interconnection Standards Fair on 9/17/24
|
Legal and regulatory, Markets, Planning |
08/15/2024, 12:00 AM |
Notification of revised RC West operating procedures RC0110 and RC0420
|
Operations |
08/15/2024, 12:00 AM |
Storage Bid Cost Recovery and Default Energy Bids Enhancements, call on 8/19/24
|
Markets |
08/15/2024, 12:00 AM |
RC West Oversight Committee meeting on 8/22/24, agenda posted
|
Markets, Governance and committees |
08/15/2024, 12:00 AM |
Notification of revised ISO operating procedures 2710, 2720, 3100, and 3220
|
Operations |
08/15/2024, 12:00 AM |
Penalty Enhancements Demand Response, Investigation and Tolling: draft tariff language posted, call on 8/22/24
|
Legal and regulatory, Markets |
08/15/2024, 12:00 AM |
Business Practice Manual Change Management call on 8/20/24
|
Legal and regulatory, Markets |
08/14/2024, 12:00 AM |
Changes to Net-Demand Uncertainty Requirement Calculation Methodology in Flexible Ramping Product effective trade date 8/14/24
|
Markets, Operations |
08/12/2024, 12:00 AM |
Revised 2024 Transmission Plan Deliverability Allocation Report posted
|
Legal and regulatory, Markets, Planning |
08/12/2024, 12:00 AM |
Section 43A.6.3 Report of Non-Resource Adequacy Capacity for July 2024
|
Legal and regulatory, Markets |
08/12/2024, 12:00 AM |
Generator Interconnection Applications: Redacted individual generator interconnection Appendix A reports for Cluster 14 Phase 2 posted on the ISO Market Participant Portal
|
Legal and regulatory, Markets, Planning |
08/08/2024, 12:00 AM |
2025 Annual import allocation process: Step 12 remaining import capability posted
|
Markets, Operations |
08/08/2024, 12:00 AM |
Preliminary NERC/WECC Charge Settlement Statements and Invoices for Assessment Year 2025
|
Markets |
08/06/2024, 12:00 AM |
ISO Board of Governors and Western Energy Markets Governing Body meetings on 8/13/24 and 8/19/24, Final agendas posted; Updated schedule
|
Markets, Governance and committees |
08/06/2024, 12:00 AM |
Changes to Net-Demand Uncertainty Requirement Calculation Methodology in Flexible Ramping Product effective trade date 8/14/24
|
Markets, Operations |
08/05/2024, 12:00 AM |
2022-2023 Competitive Solicitation Validation, Qualification and Sponsor Selection Costs for the North Songs -Serrano 500 kV Line Project posted
|
Legal and regulatory, Markets, Planning |
08/05/2024, 12:00 AM |
ISO Today mobile app available in Google Play store
|
Information Technology |
08/02/2024, 12:00 AM |
2024 Transmission Plan Deliverability Allocation Results for Generator Interconnection posted
|
Planning |
08/02/2024, 12:00 AM |
New initiative: Inter-SC Trades in Regional Markets Straw Proposal posted, call on 8/20/24
|
Markets |
08/02/2024, 12:00 AM |
Subscriber Participating Transmission Owner Model - Business Requirements Specification available; Comments due 8/15/24
|
Planning |
08/02/2024, 12:00 AM |
Notification of revised ISO operating procedure 4100
|
Operations |
08/01/2024, 12:00 AM |
Advisory Shutdown Minimum Load Cost Disqualification in Bid Cost Recovery Activation effective 8/1/24
|
Markets, Operations, Information Technology |
07/31/2024, 12:00 AM |
Department of Market Monitoring 2023 Annual Report on Market Issues and Performance, call on 8/7/24
|
Markets |
07/31/2024, 12:00 AM |
Day-Ahead Market Enhancements: Configurable Parameters Implementation working group on 8/7/24
|
Markets |
07/31/2024, 12:00 AM |
Price Formation Enhancements: Rules for Bidding Above the Soft Offer Cap Activation effective 8/1/24
|
Markets, Information Technology |
07/31/2024, 12:00 AM |
2024 20-Year Transmission Outlook posted
|
Planning |
07/31/2024, 12:00 AM |
Notice of new market participants as of 7/31/24
|
Markets |
07/31/2024, 12:00 AM |
Notification of revised ISO operating procedure 3530I
|
Operations |
07/30/2024, 12:00 AM |
BPM change management: Proposed revision requests and updated BPMs posted as of 7/30/24
|
Legal and regulatory |
07/30/2024, 12:00 AM |
Summer Market Performance Report for June 2024 posted
|
Markets |
07/30/2024, 12:00 AM |
2025 Budget and Grid Management Charge Process, call on 8/6/24
|
Markets, Operations |
07/30/2024, 12:00 AM |
Tariff Clarifications Filing 2024: Final clarifications matrix posted
|
Legal and regulatory, Planning |
07/29/2024, 12:00 AM |
Western Energy Markets Regional Issues Forum – Sector Liaison Search
|
Markets, Governance and committees |
07/26/2024, 12:00 AM |
Storage Bid Cost Recovery and Default Energy Bids Enhancements: Issue paper and straw proposal posted; call on 8/5/24
|
Markets |
07/26/2024, 12:00 AM |
2025 Annual import allocation process: Step 10 remaining import capability posted
|
Markets |
07/26/2024, 12:00 AM |
Resource Adequacy Modeling and Program Design: Revised Discussion Paper and Final Recommendation Plan posted
|
Markets |
07/26/2024, 12:00 AM |
Citizens Pacific Transmission, LLC submits new Participating Transmission Owner application to California ISO
|
Legal and regulatory, Markets, Operations, Planning |
07/25/2024, 12:00 AM |
Notice of new market participant as of 7/22/24
|
Markets |
07/24/2024, 12:00 AM |
Market Surveillance Committee teleconference meeting on 7/30/24: Final Agenda posted; Meeting materials to be posted
|
Markets, Governance and committees |
07/24/2024, 12:00 AM |
Reminder: FERC Order No. 881 - Managing Transmission Line Ratings working group calls: Methodologies on 7/23/24; Data submission on 7/30/24
|
Markets |
07/23/2024, 12:00 AM |
2025 Net Qualifying Capacity values for Resource Adequacy Resources posted
|
Markets, Operations |
07/23/2024, 12:00 AM |
2024 Summer Assessment Multi-Hour Stack Model posted
|
Planning |
07/23/2024, 12:00 AM |
Annual Policy Initiatives Roadmap Process 2024: Final discretionary policy initiatives catalog release
|
Markets, Operations, Information Technology |
07/19/2024, 12:00 AM |
New stakeholder process document posted - Policy Initiative Timeline Overview
|
Markets |
07/19/2024, 12:00 AM |
Penalty Enhancements Demand Response Investigation and Tolling draft final proposal posted, call on 7/25/24
|
Markets |
07/18/2024, 12:00 AM |
Transmission Development Forum call on 7/31/24
|
Planning |
07/18/2024, 12:00 AM |
Department of Market Monitoring 2023 Special Report on Battery Storage posted
|
Markets |
07/17/2024, 12:00 AM |
Customer Partnership Group for Congestion Revenue Rights upgrade project call on 7/25/24
|
Markets, Information Technology |
07/17/2024, 12:00 AM |
Business Practice Manual Change Management call on 7/23/24
|
Legal and regulatory |
07/16/2024, 12:00 AM |
Notice of new market participant as of 7/12/24
|
Markets |
07/15/2024, 12:00 AM |
2022-2023 Transmission Planning Process: Competitive Solicitation Validation, Qualification and Sponsor Selection Costs for the Imperial Valley - North Songs 500 kV Substation and Line Project posted
|
Legal and regulatory, Markets, Planning |
07/15/2024, 12:00 AM |
Tariff Clarifications Filing Process 2024: revised clarifications matrix posted
|
Legal and regulatory, Planning |
07/15/2024, 12:00 AM |
WEIM Governing Body, Joint, ISO Board of Governors, DMM Oversight Committee and Audit Committee: 7/16/24 - 7/18/24 meetings; final agendas posted
|
Markets, Governance and committees |
07/12/2024, 12:00 AM |
Notification of revised ISO operating procedure 2540
|
Operations |
07/12/2024, 12:00 AM |
FERC Order No. 881 - Managing Transmission Line Ratings Phase 2: Data submission working group on 7/23/24
|
Markets |
07/11/2024, 12:00 AM |
Notice of new market participant as of 7/11/24
|
Markets |
07/11/2024, 12:00 AM |
Storage Bid Cost Recovery and Default Energy Bids Enhancements: Workshop comments extended to 7/18/24; Second workshop to be held 7/22/24
|
Markets |
07/11/2024, 12:00 AM |
Tariff Clarifications Filing 2024: Comment deadline for clarifications matrix and draft tariff language extended to 7/17/24
|
Legal and regulatory, Planning |
07/11/2024, 12:00 AM |
Previous CAISO website will be decommissioned 7/15/24
|
Legal and regulatory, Markets, Operations, Planning, Information Technology, Governance and committees |
07/11/2024, 12:00 AM |
Notification of revised RC West operating procedure RC0420
|
Operations |
07/11/2024, 12:00 AM |
West-Wide Governance Pathways - Step 1 Initiative: Stakeholder Call on 7/23/24; Reminder: Comments due 7/10/24 regarding Step 1 Recommendation
|
Legal and regulatory, Markets, Governance and committees |
07/10/2024, 12:00 AM |
Section 43A.6.3 Report of Non-Resource Adequacy Capacity for June 2024
|
Legal and regulatory, Markets |
07/10/2024, 12:00 AM |
Update: Virtual-only Greenhouse Gas Coordination working group on 7/15/24 moved to 7/29/24
|
Markets |
07/10/2024, 12:00 AM |
WEIM Governing Body, Joint, ISO Board of Governors, DMM Oversight Committee and Audit Committee: 7/16/24 - 7/18/24 meetings; draft agendas; updated meeting schedule
|
Markets, Governance and committees |
07/09/2024, 12:00 AM |
2025 Import Capability Assignment Process Steps 6 and 7
|
Legal and regulatory, Markets, Planning |
07/09/2024, 12:00 AM |
Interconnection Process Enhancements 2023: Track 3A revised straw proposal and track 3B straw proposal posted, workshop on 7/15/24
|
Markets, Planning |
07/08/2024, 12:00 AM |
Notification of revised ISO operating procedures 3140A and 4110A
|
Operations |
07/08/2024, 12:00 AM |
Notice of new market participant as of 7/3/24
|
Markets |
07/03/2024, 12:00 AM |
Price Formation Enhancements Rules for Bidding Above the Soft Offer Cap: Pre-Market simulation webinar training session on 7/11/24
|
Legal and regulatory, Markets |
07/03/2024, 12:00 AM |
BPM change management: Proposed revision requests and updated BPMs posted as of 7/2/24
|
Legal and regulatory |
07/02/2024, 12:00 AM |
Tariff Clarifications 2024: Clarifications matrix and draft tariff language posted, call on 7/10/24
|
Legal and regulatory, Planning |
07/01/2024, 10:53 AM |
2025 Import Capability Assignment Process Step 1
|
Legal and regulatory, Markets, Planning |
07/01/2024, 12:00 AM |
Notification of revised ISO Operating Procedures 2210D, 2510, 2510A, 2510B, 4410D, and 4420
|
Operations |
07/01/2024, 12:00 AM |
New initiative: Storage Bid Cost Recovery and Default Energy Bids Enhancements workshop, call on 7/8/24
|
Markets |
07/01/2024, 12:00 AM |
Resource Sufficiency Evaluation Enhancements Phase 2 Track 2 activation effective today 7/1/24
|
Markets, Information Technology |
07/01/2024, 12:00 AM |
2024 FERC Billing Rate Adjustment and 2023 FERC Fees Supplemental Billing
|
Markets |
06/28/2024, 12:00 AM |
Resource Sufficiency Evaluation Enhancements Phase 2 Track 2 Activation Effective 7/1/24
|
Markets, Information Technology |
06/28/2024, 12:00 AM |
2024-2025 Transmission Planning Process: Final Study Plan Posted
|
Planning |
06/27/2024, 12:00 AM |
Decommissioning Date for Previous CAISO Website has been Extended to 7/15/24
|
Legal and regulatory, Markets, Operations, Planning, Information Technology, Governance and committees |
06/27/2024, 12:00 AM |
Updated Wheeling Access Charge Rates Effective 7/1/24
|
Markets |
06/26/2024, 12:00 AM |
Notification of revised ISO Operating Procedure 4420 Draft Version Posted for Awareness
|
Operations |
06/26/2024, 12:00 AM |
Updated Wheeling Access Charge Rates Effective 1/1/24
|
Markets |
06/26/2024, 12:00 AM |
Notice of WESTLYQNTO Intertie Name Change effective 7/1/24
|
Markets, Operations |
06/26/2024, 12:00 AM |
Interconnection Process Enhancements 2023: Track 2 Draft Tariff Language Posted, Call on 7/11/24
|
Legal and regulatory, Markets, Planning |
06/26/2024, 12:00 AM |
Save the Date - Resource Interconnection Standards Fair on 9/17/24
|
Legal and regulatory, Markets, Planning |
06/25/2024, 12:00 AM |
Registration Now Open for the 2024 ISO Stakeholder Symposium; Sponsorship Opportunities Available
|
Legal and regulatory, Markets, Operations, Planning, Information Technology, Governance and committees |
06/25/2024, 12:00 AM |
2022-2023 Transmission Planning Process: Competitive Solicitation Validation, Qualification and Sponsor Selection Costs for the North Gila - Imperial Valley 500 kV Line Project posted
|
Legal and regulatory, Markets, Planning |
06/24/2024, 12:00 AM |
Great Basin Transmission, LLC Submits New Participating Transmission Owner Application to California ISO
|
Legal and regulatory, Markets, Operations, Planning |
06/24/2024, 12:00 AM |
Extended Day-Ahead Market ISO Balancing Authority Area Participation Rules Track A: Business Requirements Specifications Posted
|
Legal and regulatory, Markets, Information Technology |
06/21/2024, 12:00 AM |
Notification of Revised ISO Operating Procedure 3140A Posted for Review and Comment
|
Operations |
06/20/2024, 12:00 AM |
Market Performance and Planning Forum, Hybrid Meeting on 6/27/24
|
Markets, Information Technology |
06/20/2024, 12:00 AM |
Deliverability Assessment Dispatch Methodology update for solar and wind, call on 6/26/24
|
Planning |
06/19/2024, 12:00 AM |
2023-2024 Transmission Planning Process, Phase 3 Competitive Solicitation: Bid window open and informational call
|
Planning |
06/19/2024, 12:00 AM |
Cancelled: Customer Partnership Group for Congestion Revenue Rights upgrade project call on 6/27/24
|
Operations, Information Technology |
06/19/2024, 12:00 AM |
Annual Policy Initiatives Roadmap Process 2024: Reminder Draft Discretionary Policy Initiatives Catalog Survey due 6/26/24
|
Markets, Operations, Information Technology |
06/19/2024, 12:00 AM |
Business Practice Manual Change Management Call on 6/25/24
|
Legal and regulatory, Markets |
06/18/2024, 12:00 AM |
Reminder for previous CAISO website will be decommissioned effective July 1, 2024
|
Legal and regulatory, Markets, Operations, Planning, Information Technology, Governance and committees |
06/17/2024, 12:00 AM |
Notification of Revised RC West Operating Procedures RC0320 and RC0410
|
Operations |
06/14/2024, 12:00 AM |
Update: Greenhouse Gas Coordination Working Group on 6/26/24 Moved to 7/15/24 and Virtual-Only Format
|
Markets |
06/14/2024, 12:00 AM |
2024 Transmission Plan Deliverability Allocation Report
|
Legal and regulatory, Markets, Planning |
06/14/2024, 12:00 AM |
Interregional Transmission Coordination Call on 6/21/24
|
Planning |
06/14/2024, 12:00 AM |
Registration Reminder: Market Performance and Planning Forum Hybrid Meeting on 6/27/24
|
Markets, Operations, Information Technology |
06/13/2024, 12:00 AM |
2023-2024 Transmission Planning Process: Competitive Solicitation Key Selection Factors Posted
|
Planning |
06/13/2024, 12:00 AM |
Notice of New Market Participants as of 6/13/24
|
Markets |
06/13/2024, 12:00 AM |
Notification of Revised ISO Operating Procedures 2210Z, 2510A, 2510B and 4410D
|
Operations |
06/12/2024, 12:00 AM |
Updated Wheeling Access Charge Rates Effective 6/12/24
|
Markets |
06/12/2024, 12:00 AM |
Western Energy Imbalance Market Regional Issues Forum on 6/20/24, Final Agenda Posted; Registration Requested
|
Markets, Governance and committees |
06/12/2024, 12:00 AM |
Section 43A.6.3 Report of Non-Resource Adequacy Capacity for May 2024
|
Legal and regulatory, Markets |
06/10/2024, 12:00 AM |
2023-2024 Transmission Planning Process, Call on 6/17/24
|
Planning |
06/10/2024, 12:00 AM |
Notice of New Market Participant as of 6/10/24
|
Markets |
06/10/2024, 12:00 AM |
West-Wide Governance Pathways Initiative - Step 1: Recommendation posted; Call on 6/18/24
|
Markets, Governance and committees |
06/07/2024, 12:00 AM |
Resource Adequacy Modeling and Program Design Hybrid Working Group on 6/18/24
|
Markets |
06/07/2024, 12:00 AM |
Notice of New Intertie DELANEY500, Effective 6/12/24
|
Markets, Operations |
06/07/2024, 12:00 AM |
Greenhouse Gas Coordination Hybrid Working Group on 6/26/24
|
Markets |
06/07/2024, 12:00 AM |
Notice of New Market Participant as of 6/6/24
|
Markets |
06/06/2024, 12:00 AM |
Interconnection Process Enhancements 2023: Final Revised Addendum to Final Proposal Posted
|
Planning |
06/06/2024, 12:00 AM |
2023-2024 Transmission Planning Process: Board Approved Transmission Plan Posted
|
Planning |
06/06/2024, 12:00 AM |
500kV Lines Rating Reinstatement for Pacific Gas and Electric, Effective 6/5/24
|
Markets, Operations |
06/05/2024, 12:00 AM |
Activation for Import Allocations Automation Process implementation on 6/5/24
|
Markets, Planning, Information Technology |
06/05/2024, 12:00 AM |
WEIM Governing Body Hybrid Meeting on 6/20/24; Revised Final Agenda posted; Registration requested but Not Required
|
Markets, Governance and committees |
06/05/2024, 12:00 AM |
Annual Policy Initiatives Roadmap Process 2024: Draft Discretionary Policy Initiatives Catalog, Call on 6/12/24
|
Markets, Information Technology |
06/05/2024, 12:00 AM |
Advisory Shut-Down Bid Cost Recovery Webinar Training Session on 06/11/24
|
Markets |
06/04/2024, 12:00 AM |
April 2024 Eclipse Post Analysis Report Posted
|
Markets |
06/03/2024, 12:00 AM |
2023 NERC/WECC Metered Demand Calculations for Assessment Year 2025
|
Markets |
06/03/2024, 12:00 AM |
2024 Stochastic Production Cost Simulation Model Posted
|
Planning |
06/03/2024, 12:00 AM |
2022-2023 Transmission Planning Process: North of SONGS - Serrano 500kV Line Project Report
|
Planning |
05/31/2024, 12:00 AM |
WEIM Governing Body Hybrid Meeting on 6/20/24; Final Agenda Posted; Registration Requested
|
Markets, Governance and committees |
05/31/2024, 12:00 AM |
Maximum Import Bid Price: Comment Template for White Paper Posted, Comments Due 6/11/24
|
Markets |
05/30/2024, 12:00 PM |
Annual Policy Initiatives Roadmap Process 2024: Working Group on 6/12/24
|
Markets, Operations, Information Technology |
05/30/2024, 12:00 AM |
BPM change management: Proposed revision requests and updated BPMs posted as of 5/30/24
|
Legal and regulatory |
05/30/2024, 12:00 AM |
Notification of Revised RC West Operating Procedures RC0120A, RC0330, RC0460 and RC0460F
|
Operations |
05/30/2024, 12:00 AM |
Notification of Revised ISO Operating Procedure 2210Z
|
Operations |
05/30/2024, 12:00 AM |
ISO Board of Governors General Session Meeting on 6/12/24, Final Agenda Posted
|
Markets, Governance and committees |
05/30/2024, 12:00 AM |
No Content Posted to CAISO.com, No Daily Briefing on May 29, Due to New Website Launch
|
Legal and regulatory, Markets, Operations, Planning, Information Technology, Governance and committees |
05/28/2024, 12:00 AM |
Penalty Enhancements Demand Response Investigation and Tolling: Revised Straw Proposal Posted, Call on 6/3/24
|
Markets |
05/25/2024, 12:00 AM |
Transmission Service and Market Scheduling Priorities Phase 2 Available For Daily Wheeling Through Priority Effective Operating Date 6/1/24; Request Window Opens 5/25/24
|
Markets, Planning, Information Technology |
05/24/2024, 12:00 AM |
Updated Wheeling Access Charge Rates Effective 1/1/24
|
Markets |
05/24/2024, 12:00 AM |
Greenhouse Gas Coordination: Working Group on 5/29/24 Moved to Virtual-Only Format
|
Markets |
05/24/2024, 12:00 AM |
Western Energy Imbalance Market Regional Issues Forum on 6/20/24, Draft Agenda Posted; Registration Requested
|
Markets, Governance and committees |
05/23/2024, 12:00 AM |
Customer Partnership Group for Congestion Revenue Rights Upgrade Project Call on 5/30/24
|
Markets, Information Technology |
05/23/2024, 12:00 AM |
ISO website Maintenance on Stakeholder Initiative Webpages Tonight, 5/23/24
|
Information Technology |
05/23/2024, 12:00 AM |
Registration Reminder: Greenhouse Gas Coordination Working Group on 5/29/24
|
Markets |
05/23/2024, 12:00 AM |
2025 Import Capability Allocation and Transfer Registration Process
|
Legal and regulatory, Markets, Planning |
05/22/2024, 12:00 AM |
CPUC Annual Resource Adequacy Subpoena Issued
|
Legal and regulatory, Markets |
05/22/2024, 12:00 AM |
Maximum Import Bid Price Analysis Workshop to Discuss Hourly Shaping Factor, Call on 5/28/24
|
Markets |
05/21/2024, 12:00 AM |
Gas Resource Management: Discussion Paper Posted; Comments Due 6/5/24
|
Markets |
05/21/2024, 12:00 AM |
Price Formation Enhancements - Rules for Bidding Above the Soft Offer Cap: Revised Draft Tariff Language Posted, Comments Extended to 5/27/24
|
Legal and regulatory, Markets |
05/21/2024, 12:00 AM |
2022-2023 Transmission Planning Process Approved Project Sponsor for the North of SONGS - Serrano 500kV Transmission Line Project
|
Planning |
05/20/2024, 12:00 AM |
Price Formation Enhancements: Final Proposal for Rules for Bidding Above the Soft Offer Cap posted
|
Markets |
05/17/2024, 11:00 AM |
Release of April 2024 Renewables Performance Report
|
Markets |
05/17/2024, 11:00 AM |
Interconnection Process Enhancements 2023: Revised addendum to final proposal posted
|
Markets, Operations, Planning |
05/17/2024, 11:00 AM |
Capacity Procurement Mechanism Enhancements Track 2: CPM Soft Offer Cap effective date 6/1/24
|
Markets |
05/17/2024, 11:00 AM |
WEIM Governing Body, Joint, ISO Board of Governors, DMM Oversight Committee and Audit Committee: 5/21/24 - 5/23/24 meetings; final agendas posted; 2024-2025 meeting schedule
|
Markets, Governance and committees |
05/17/2024, 11:00 AM |
Notice of new market participants as of 5/16/24
|
Markets |
05/16/2024, 10:15 AM |
Notification of revised ISO operating procedures 4510, 4510B and 4510F
|
Operations |
05/16/2024, 10:15 AM |
Business Practice Manual Change Management Call on 5/21/24
|
Legal and regulatory, Markets |
05/15/2024, 12:00 AM |
WEIM Governing Body, Joint, ISO Board of Governors, DMM Oversight Committee and Audit Committee: 5/21/24 - 5/23/24 Meetings; Draft Agendas Posted
|
Markets, Governance and committees |
05/14/2024, 9:40 AM |
Price Formation Enhancements - Rules for Bidding Above the Soft Offer Cap Draft Tariff Language Posted, Comments due 5/24/24
|
Markets |
05/14/2024, 9:40 AM |
Notice of New Market Participants as of 5/13/24
|
Markets |
05/13/2024, 8:54 AM |
Section 43A.6.3 Report of Non-Resource Adequacy Capacity for April 2024
|
Legal and regulatory, Markets |
05/10/2024, 11:00 AM |
Full Network Model Schedule for 2025 posted
|
Markets, Operations |
05/10/2024, 11:00 AM |
Market Surveillance Committee meeting on 5/15/24, final agenda posted; Draft Opinion to be posted
|
Markets, Governance and committees |
05/10/2024, 11:00 AM |
2022-2023 Transmission Planning Process: Imperial Valley - North of SONGs 500kV Substation and Line Project Report
|
Legal and regulatory, Markets |
05/09/2024, 3:00 PM |
Revised - Updated meeting schedule for ISO Board of Governors: Board to receive Briefing on Interconnection Process Enhancements Track 2 Final Proposal at 5/23/24 meeting; special session for Board Decision on 6/12/24
|
Markets, Governance and committees |
05/09/2024, 11:00 AM |
Updated calendar link: Day-Ahead Sufficiency: Straw proposal posted, call on 5/13/24
|
Legal and regulatory, Markets |
05/09/2024, 11:00 AM |
Interconnection Process Enhancements 2023: Addendum to final proposal, technical workshop on 5/16/24
|
Markets, Operations, Planning |
05/09/2024, 11:00 AM |
2024 California ISO Summer Loads and Resources Assessment posted
|
Markets, Operations |
05/08/2024, 3:15 PM |
Registration Reminder: Greenhouse Gas Coordination working group on 5/29/24
|
Markets |
05/08/2024, 12:30 PM |
Annual Policy Initiatives Roadmap Process 2024 working group on 5/15/24
|
Markets |
05/08/2024, 12:30 PM |
New interactive Resource Owner/Operator Desk Reference Guide now available
|
Markets, Operations |
05/07/2024, 12:00 PM |
Price Formation Enhancements: Draft Final Proposal for Rules for Bidding Above the Soft Offer Cap to be reposted with clarifications, Comments due 5/8/24
|
Markets |
05/07/2024, 12:00 PM |
Notification of revised ISO operating procedure 1210
|
Operations |
05/06/2024, 11:00 AM |
Day-Ahead Sufficiency: Straw proposal posted, call on 5/13/24
|
Legal and regulatory, Markets |
05/06/2024, 11:00 AM |
Webinar Training Sessions for the New CAISO Website on 5/23/24 and 5/29/24
|
Legal and regulatory, Markets, Operations, Planning, Information Technology, Governance and committees |
05/06/2024, 11:00 AM |
Western Energy Imbalance Market Regional Issues Forum on 6/20/24; registration requested
|
Markets, Governance and committees |
05/06/2024, 11:00 AM |
Regional Issues Forum Roundtable Summary posted
|
Markets, Governance and committees |
05/03/2024, 10:00 AM |
Updated Wheeling Access Charge Rates effective 1/1/24
|
Markets |
05/03/2024, 10:00 AM |
Draft tariff language relating to intertie import tagging rules, call on 5/9/24
|
Legal and regulatory, Markets |
05/02/2024, 11:00 AM |
Notification of revised RC West operating procedures RC0410 and RC0410A
|
Operations |
05/02/2024, 11:00 AM |
Notification of revised ISO operating procedures 2330 and 2390
|
Operations |
05/02/2024, 11:00 AM |
Price Formation Enhancements: Comment template posted for Draft Final Proposal - Rules for Bidding Above the Soft Offer Cap, Comments due 5/8/24
|
Markets |
05/02/2024, 11:00 AM |
Annual Policy Initiatives Roadmap Process 2024 working group on 5/8/24
|
Markets, Operations, Information Technology |
05/01/2024, 11:41 AM |
Price Formation Enhancements: Draft Final Proposal for Rules for Bidding Above the Soft Offer Cap posted with comments due 5/8/24, working group on 5/2/24
|
Markets |
05/01/2024, 10:36 AM |
RC West Oversight Committee meeting on 5/15/24, agenda posted
|
Governance and committees |
05/01/2024, 10:36 AM |
Interconnection Process Enhancements 2023: Track 2 draft final proposal meeting on 2/15/24
|
Markets, Operations, Planning |
01/25/2024, 1:00 PM |
Notification of revised ISO operating procedures 2330 and 2720
|
Operations |
01/25/2024, 1:00 AM |
SunZia Transmission, LLC submits new Participating Transmission Owner application to California ISO
|
Legal and regulatory, Markets, Operations, Planning |
01/24/2024, 1:00 PM |
RC West has revised and posted operating procedure RC0610 for visibility prior to 4/1/24 effective date
|
Operations |
01/24/2024, 1:00 PM |
Gas Resource Management working group call on 1/25/24
|
Markets |
01/17/2024, 1:00 PM |
Reliability Demand Response Resource Minimum On Time final proposal, call on 1/24/24
|
Markets |
01/17/2024, 1:00 PM |
Notification of revised ISO Available Transfer Capability Implementation Document and Transmission Reliability Margin Implementation Document
|
Operations |
01/17/2024, 1:00 PM |
Customer Partnership Group for Congestion Revenue Rights upgrade project call on 1/25/24
|
Markets |
01/17/2024, 1:00 PM |
Price Formation Enhancement working group meeting 1/24/24 changed from hybrid to virtual-only format, memo posted
|
Planning |
01/17/2024, 1:00 PM |
Automated Dispatch System changes to Partial Acceptance functionality and User Interface implementation on 11/15/23
|
Markets, Information Technology |
11/14/2023, 12:45 AM |
Automated Dispatch System changes to Partial Acceptance functionality and User Interface
|
Markets, Information Technology |
11/01/2023, 1:45 AM |
New Initiative: Capacity Procurement Mechanism Enhancements: Track 1 straw proposal posted, call on 8/4/22
|
Planning |
07/28/2022, 12:00 AM |
Notification of revised ISO operating procedures 5360 and 5510
|
Operations |
07/28/2022, 12:00 AM |
2023 Annual Import Allocation Process: Step 10 Remaining Import Capability
|
Operations |
07/26/2022, 12:00 AM |
Summer Market Performance Report for June 2022, call on 7/29/22
|
Markets |
07/22/2022, 12:00 AM |
Business Practice Manual change management call on 6/28/22
|
Legal and regulatory |
06/21/2022, 12:00 AM |
2021-2022 Transmission Planning Process, Call 11/18/21
|
Planning |
11/11/2021, 1:30 PM |
No results |