Library

2018 Local capacity requirements process

3 topics

21 documents

21 of 21 results
Title Type Posted
Physical Resource List Used During 2019 and 2023 Local Capacity Technical Studies - Based on 2018 Net Qualifying Capacity 655.50 KB
Technical Documentation 05/15/2018, 8:36 AM
Final 2022 Long-Term Local Capacity Technical Report 2.36 MB
Report 05/03/2017, 2:41 PM
Comment Matrix - ISO Responses on Final 2018 and 2022 Local Capacity Technical Study Stakeholder Meeting - April 13, 2017 400.68 KB
Comment 05/03/2017, 2:41 PM
LS Power Comments on Draft Final 2018 and 2022 Local Capacity Requirement Results 341.16 KB
Comment 05/03/2017, 9:21 AM
Cogentrix Comments on Draft Final 2018 and 2022 Local Capacity Requirement Results 184.81 KB
Comment 05/03/2017, 9:21 AM
SDGE Comments on Draft Final 2018 and 2022 Local Capacity Requirement Results 164.82 KB
Comment 05/03/2017, 9:21 AM
SCE Comments on Draft Final 2018 and 2022 Local Capacity Requirement Results 75.15 KB
Comment 05/03/2017, 9:21 AM
CPUC Energy Division Staff Comments on Draft Final 2018 and 2022 Local Capacity Requirement Results 361.42 KB
Comment 05/03/2017, 9:21 AM
Final 2018 Local Capacity Technical Report 2.39 MB
Report 05/01/2017, 2:48 PM
Comment Matrix - ISO Responses on Draft 2018 and 2022 Local Capacity Technical Study Stakeholder Meeting - Mar 9, 2017 383.71 KB
Comment 04/17/2017, 11:34 AM
Draft 2022 Long-Term Local Capacity Technical Report 2.64 MB
Report 04/10/2017, 11:57 AM
Physical Resource List Used During 2018 and 2022 Local Capacity Technical Studies - Based on 2017 Net Qualifying Capacity 713.00 KB
Technical Documentation 04/06/2017, 4:12 PM
Draft 2018 Local Capacity Technical Report 2.45 MB
Report 04/06/2017, 2:31 PM
SDG&E Comments - 2018 and 2022 Draft Local Capacity Requirements Results 60.81 KB
Comment 04/03/2017, 1:09 PM
PG&E Comments - 2018 and 2022 Draft Local Capacity Requirements Results 85.70 KB
03/29/2017, 12:51 PM
CPUC Comments - 2018 and 2022 Draft Local Capacity Requirements Results 113.75 KB
Comment 03/29/2017, 12:51 PM
2018 Local Capacity Requirements Final Study Manual 464.81 KB
Technical Documentation 12/05/2016, 8:17 AM
CPUC Comments - 2018 LCR Study Criteria Methodology and Assumptions 344.97 KB
Comment 12/01/2016, 1:52 PM
PGE Comments - 2018 LCR Study Criteria Methodology and Assumptions 220.74 KB
Comment 12/01/2016, 1:52 PM
Physical Resource List Used During the 2014 and 2018 Local Capacity Technical Study - Based on 2013 NQC 394.00 KB
Study 04/30/2013, 9:04 AM
Final 2018 Long-term Local Capacity Technical Study Report Apr 30, 2013 513.57 KB
Study 04/30/2013, 9:02 AM
No results
Back to top