Affected system impacts of generator interconnection (completed)

Outcome: The ISO clarified interconnection customer roles and responsibilities in the Business Practice Manuals and generator interconnection procedures for associated impacts to adjacent and directly connected electrical systems. In addition, the ISO assumed more responsibility to coordinate study information and various meetings with potentially affected systems. — BPM approved: Sep 18, 2014

Interconnecting generation facilities can cause reliability concerns on directly connected and adjacent electric systems. The ISO tariff addresses these situations at a high level. Through this initiative, the ISO proposes processes and principles that should be included in the Business Practice Manual for Generator Interconnection Procedures to address these impacts. These changes will then be vetted through the BPM change management process.