Participating transmission owner per unit costs

Learn the anticipated costs of procuring and installing facilities required to interconnect Generation to the applicable Participating Transmission Owner.

2 topics

2 documents

2 of 2 results
Title Type Posted
Current Emergency Interconnection Network Upgrade Maximum 129.60 KB Report 07/02/2026, 2:14 PM
Current Reliability Network Upgrade Reimbursement Maximum 131.61 KB Report 06/30/2026, 2:41 PM