Real-time market / constraint enforcement (completed)
Outcome: The implementation of these tariff changes will exempt load and exports of load following metered subsystems (MSSs) from the allocation of the real-time imbalance energy neutrality offset. — Effective: Oct. 1, 2009; FERC Order: Nov. 9, 2009
The California ISO is proposing a modification to clarify the enforcement of constraints in the ISO market processes and the relationship of the Full Network Model to transmission constraints. The ISO proposes to make necessary clarifications to the Full Network Model function description as it relates to the ISO's transmission constraints enforcement in its market operations.
3 documents
3 of 3 results
| Title | Type | Posted | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| WPTF Comments on Draft RTM/Constraint Enforcement Tariff Language 12.25 KB | Comment | 07/22/2009, 9:20 AM | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| SCE Comments on Draft RTM/Constraint Enforcement Tariff Language 12.52 KB | Comment | 07/22/2009, 9:19 AM | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Draft RTM/Constraint Enforcement Tariff Language 09-Jul-2009 23.44 KB | Tariff | 07/08/2009, 10:55 AM | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| No results | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||