Library
Self-schedules bid cost recovery allocation and bid floor
This initiative considers lowering the bid price floor and removing the exemption from day-ahead bid cost recovery allocation for load served by self-scheduled generation. These modifications will more accurately represent ISO market costs and allocate them based on cost-causation. They will also provide greater incentive for economic bidding and allow the market to more efficiently address over-supply conditions, which will be increasingly important as the resource fleet reaches a 50% renewable portfolio standard.
3 documents
3 of 3 results
Title | Type | Posted | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Addendum to Draft Final Proposal - Self-Schedules Bid Cost Recovery Allocation and Bid Floor 609.54 KB | Paper | 09/16/2016, 10:02 AM | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DMM Comments - Self-Schedules Bid Cost Recovery Allocation and Bid Floor 254.91 KB | Comment | 08/25/2016, 2:35 PM | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Draft Final Proposal - Self-Schedules Bid Cost Recovery Allocation and Bid Floor 604.89 KB | Proposal | 08/11/2016, 2:27 PM | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
No results |