Skip Ribbon Commands
Skip to main content
Sign In
 
​Price Correction messages are available in OASIS under the Atlas Reference tab

Reports and bulletins keep you current

Special reports and audits published by the ISO can help keep you up-to-date on our markets and operations.

 

Market reports

Reports and audits regarding system events and other operational issues including frequency response and contingency reserve charts, reports on load shedding and other events, and operational studies.

  • Monthly renewables report, greenhouse gas, wind and solar curtailment reports
    These reports provide important information about actual renewable energy within the ISO grid as we move towards integrating more renewable resources.
  • Market performance reports
  • Capacity procurement mechanism
    The ISO issues preliminary notification of a CPM designation through a market notice and provides additional details in a formal designation report within 10 days after the end of the month.
  • Demand response net benefits test results
    These results provide on-peak and off-peak monthly threshold market clearing prices applicable to demand response resources. The results are published on the 15th of every month for the preceding trade month.
  • Exceptional dispatch reports
    This report provides Market Participants with data on the frequency and volume of exceptional dispatches initiated within the California ISO Balancing Authority Area.
  • Non-resource adequacy capacity reports
    This report provides information of all non-RA capacities committed by the ISO and the reasons. Reports are published monthly on the 10th of each month for non-RA capacities committed in the preceding month.
  • Average emissions rate reports
    This report shows a measure of the average emissions rate (AER) covering the entire WEIM footprint. It also provides the emissions intensity of WEIM transfers into California.
  • Greenhouse gas emissions tracking reports
    This report includes an accounting of GHG emissions for the ISO balancing authority area (BAA), including ISO internal resources, net imports, and transfers from Energy Imbalance Market entities into the ISO BAA. This report also reflects the ISO assessment of GHG reductions associated with EIM operations. See Tracking Methodology and Frequently Asked Questions.
  • Market disruption reports
    This report provides Market Participants with a comprehensive record of all market disruptions occurring in the California ISO Day-Ahead and Real-Time Markets. Reports are published monthly on the 15th of every month and include data for the trade dates ending 30 days prior to the report date.
  • Minimum online commitment reports
    This report provides data on Pmin and cleared value of units committed by the MOC constraint to maintain reliability in the integrated forward market.
  • Price correction reports
    These reports provide summaries of the price corrections made by week.
  • Resource adequacy evaluation reports
    This report provides RA compliance data regarding individual and/or aggregate validation of system and local RA showings. The California ISO may implement backstop procurement if the additional reliability needs presented in these reports are not mitigated in a timely manner.

Special reports

  • Special reports
    • Department of market monitoring reports and presentations supporting data
      These temporary data files are posted per requests received by the Department of Market Monitoring.
    • Integrated resource planning preferred system portfolio model
      The California ISO provides a direct link to its production cost simulation models for the integrated resource planning (IRP) proceeding, CPUC Docket No. R.20-05-003.
    • Moorpark subarea historical load data
      This temporary data file is associated with the Center For Energy Efficiency And Renewable Technologies' data request
    • Price correction FERC waiver data
      These temporary data files are associated with the FERC waiver submitted on February 26, 2016.

Market and operations technical bulletins

Use of technical bulletins is subject to the ISO website Terms of Use.

Reports and bulletins archive