REQUESTED ACTION
Request for commentCATEGORIES
Legal and regulatoryBPM change management: Proposed revision requests and updated BPMs posted as of 11/2/26
The California ISO (ISO) has posted new Proposed Revision Requests (PRRs) reflecting edits to Business Practice Manuals (BPMs). Revised BPMs that have completed the BPM change management process are posted in the BPM Library. All PRRs and related activity are publicly available through the BPM change management site.
BPM PRR updates are part of the ISO Daily Briefing in addition to being listed in the “Announcement” sections of the BPM change management tool. These updates include PRRs that have become available for review, upcoming BPM meetings, and comment due dates. All registered BPM users should continue to reference the BPM Change Management tool to see current PRR status. Subscribe to the Daily Briefing to stay up to date.
The PRRs listed below have an open 10-business day comment or appeal period from Nov. 2, 2026, through Nov. 16, 2026.
New ISO PRRs
PRR 1710 Reliability Requirements BPM, Maximum import capability allocation and monthly transfer procedure due to CAISO branch group/scheduling point retirement
PRR 1711 Market Instruments BPM, Enhancements to the open access same time information system transmission interface usage report
ISO Recommendations
PRR 1706 Market Operations BPM, Clean-up of BPM due to minimum state of charge constraint retirement
PRR 1707 Market Instruments BPM, Two new customer market results interface reports as part of the EDAM enhancements 2026 project
PRR 1708 Reliability Requirements BPM, Clarification on the existing net qualifying capacity deliverability study process for full capacity deliverability status and interim deliverability status resources
PRR 1709 Settlements and Billing BPM, Emergency settlement release to fix high-priority settlement variances and projects
ISO PRRs On Hold
PRR 1695 Resource Interconnection Standards BPM, New BPM for resource interconnection standards
ISO Final Decisions
PRR 1688 Market Operations BPM, Formula details on fifteen-minute market ex-post capacity calculations
PRR 1696 Settlements and Billing BPM, Emergency settlement release to fix high priority settlement variances and projects
PRR 1699 Market Operations BPM, Clarifications on how intertie transmission corridor and intertie scheduling limits constraints are used for imbalance reserves
PRR 1700 Market Operations BPM, Clarification on use for the automated dispatch system automatic generation control flag
PRR 1701 Market Operations BPM, Removed three percent generation, three percent load from reserve requirement calculations
PRR 1702 Reliability Requirements BPM, Clarifications and clean up
PRR 1703 Generator Management BPM, Interconnection process enhancements 5.0 implementation for commercial viability criteria and contact requirements for agreements
PRR 1704 Metering BPM, Update to meter inspection policy and market results interface-settlements access
PRR 1705 Energy Imbalance Market BPM, Provides additional guidance on the steps required to disable real-time market participation
BPM Library Updates
The PRR tracking log on the ISO website lists the updated BPMs in the library.
The ISO may unilaterally make and implement revisions to the BPMs in emergency circumstances, as set forth in Sections 22.4.3 and 22.11 of the ISO Tariff and in Section 2.6 of the Business Practice Manual for BPM Change Management. An emergency PRR will continue through the BPM change management stakeholder process to obtain stakeholder input on the revisions and make other recommendations, as necessary.
Please note that affected parties must register in order to submit a PRR or written comments.
More information on the BPM change management process is available on the BPM webpage of the ISO website.
Meeting information
Please contact the BPM Team at BPM_CM@caiso.com with any questions.