Interconnection Process Enhancements 2023 Track 2: Revised 2024 Generator Interconnection Data posted

The California ISO has posted revisions to the generator interconnection data related to the Interconnect Process Enhancements (IPE) 2023 track 2 initiative.

The changes specifically relate to the addition of the following POI: Orchard 500 kV, San Migul 70 kV and Los Banos 70 kV. This revision also includes constraints update for some POIs and removal of duplicate entries.

The ISO is continuing its ongoing process of reviewing control and operation of certain POIs. As such, additional POIs may be added in future updates.