Skip Ribbon Commands
Skip to main content
Sign In

 

  • Integrated resource planning preferred system portfolio model
    The California ISO provides a direct link to its production cost simulation models for the integrated resource planning (IRP) proceeding, CPUC Docket No. R.20-05-003.
    • CAISO IRP 38MMT PSP Stochastic PLEXOS Models with CEC 2021 IEPR Load Forecast
      These are a series of stochastic production cost simulation models the CAISO developed based on the CPUC 2019-20 IRP Preferred System Portfolio, which was adopted in Decision 22-02-004 on February 10, 2022, and the CEC 2021 IEPR hourly load forecast. The models have been set up for the years 2023 through 2026 and 2032, and were run with PLEXOS v8.3R9. The results of the simulations were presented in a letter written by CAISO Vice President Neil Millar to CEC Vice Chair Siva Gunda on February 2, 2023
    • CAISO IRP 38MMT PSP Stochastic and Deterministic PLEXOS Models with CEC 2019 IEPR Load Forecast
      The ISO posts both stochastic and deterministic models of the CPUC 2019-20 IRP 38 million metric ton (MMT) Core Portfolio (as of January 2022) with the CEC 2019 IEPR load forecast. The modeling results were referenced in the ISO’s Opening Comments, submitted on Sept. 27, 2021.
    • Past postings