CPUC proceedings

Proceedings are listed in reverse chronological order. 

Orders instituting rulemaking

Topic Title Type Posted
R.20-05-003 Order instituting rulemaking - continue electric integrated resource planning and related procurement processes Sep 30, 2024 Opening Comments on the ALJ Ruling Seeking Comments on Electricity Resource Portfolios for 2025-2026 Transmission Planning Process - Integrated Resource Planning (R.20-05-003)
Filing 10/01/2024, 11:22 AM
R.23-10-011 Order Instituting Rulemaking - Oversee Resource Adequacy Program Sep 16, 2024 Reply Comments on Administrative Law Judge’s Ruling on Revised Slice of Day Calibration Tool and Comment Schedule - Resource Adequacy Program (R.23-10-011)
Filing 09/17/2024, 10:42 AM
R.23-10-011 Order Instituting Rulemaking - Oversee Resource Adequacy Program Sep 9, 2024 Opening Comments on Administrative Law Judge’s Ruling on Revised Slice of Day Calibration Tool and Comment Schedule - Resource Adequacy Program (R.23-10-011)
Filing 09/10/2024, 9:23 AM
R.20-05-003 Order instituting rulemaking - continue electric integrated resource planning and related procurement processes Aug 29, 2024 Opening Comments on Proposed Decision Allowing Bridge Resources for Alternative Compliance with Diablo Canyon Replacement Resource Category in D.21-06-035 - Integrated Resource Planning (R.20-05-003)
Filing 08/30/2024, 10:53 AM
R.20-05-003 Order instituting rulemaking - continue electric integrated resource planning and related procurement processes Aug 13, 2024 Reply Comments on the Proposed Decision Determining Need for Centralized Procurement of Long Lead-Time Resources - Integrated Resource Planning (R.20-05-003)
Filing 08/14/2024, 10:36 AM
R.23-10-011 Order Instituting Rulemaking - Oversee Resource Adequacy Program Aug 9, 2024 Opening Comments on Track 2 Proposals - Resource Adequacy Program (R.23-10-011)
Filing 08/09/2024, 5:40 PM
R.20-05-003 Order instituting rulemaking - continue electric integrated resource planning and related procurement processes Aug 8, 2024 Opening Comments on Proposed Decision Determining Need for Centralized Procurement of Long Lead-Time Resources - Integrated Resource Planning (R.20-05-003).pdf
Filing 08/09/2024, 10:01 AM
R.23-05-018 - Order Instituting Rulemaking to Update and Amend Commission General Order 131-D Jul 15, 2024 Reply Comments on ALJ Ruling Inviting Comment on Phase 2 Staff Proposal and Noticing Workshop (R.23-05-018)
Filing 07/16/2024, 12:02 PM
R.23-10-011 Order Instituting Rulemaking - Oversee Resource Adequacy Program Jun 11, 2024 Reply Comments on PD Adopting Local Capacity Obligations, Flexible Capacity Obligations, and Program Refinements - Resource Adequacy Program - R.23-10-011
Filing 06/12/2024, 9:06 AM
R.20-05-003 Order instituting rulemaking - continue electric integrated resource planning and related procurement processes Jun 11, 2024 Opening Comments on ALJ Ruling Seeking Comment on Staff Proposal - Integrated Resource Planning - R.20-05-003
Filing 06/12/2024, 9:06 AM
R.23-10-011 Order Instituting Rulemaking - Oversee Resource Adequacy Program Jun 6, 2024 Comments on PD adopting Local Capacity Obligations, Flexible Capacity Obligations, and Program Refinements-Resource Adequacy Program (R.23-10-011).pdf
Filing 06/07/2024, 10:09 AM
R.20-05-003 Order instituting rulemaking - continue electric integrated resource planning and related procurement processes May 24, 2024 Comments on ALJ Ruling Seeking Comments on Need and Process for Centralized Procurement of Specified LLT Resources (R.20-05-003)
Comment 05/24/2024, 4:11 PM
R.23-10-011 Order Instituting Rulemaking - Oversee Resource Adequacy Program May 13, 2024 Reply Comments on Final 2025 Local Capacity Technical Report - Resource Adequacy Program (R.23-10-011)
Filing 05/14/2024, 9:44 AM
R.23-10-011 Order Instituting Rulemaking - Oversee Resource Adequacy Program May 1, 2024 Notice of Availability of Final 2025 Local Capacity Technical Report and Update regarding 2025 Flexible Capacity Needs Assessment (R.23-10-011)
Filing 05/02/2024, 8:14 AM
R.23-10-011 Order Instituting Rulemaking - Oversee Resource Adequacy Program Apr 4, 2024 Draft 2025 Local Capacity Technical Report - Resource Adequacy Program (R.23-10-011)
Filing 04/04/2024, 1:45 PM
R.23-10-011 Order Instituting Rulemaking - Oversee Resource Adequacy Program Apr 2, 2024 Comments on Inputs and Assumptions in the Loss of Load Expectation Study - Resource Adequacy Program (R.23-10-011)
Comment 04/02/2024, 4:24 PM
R.23-10-011 Order Instituting Rulemaking - Oversee Resource Adequacy Program Mar 22, 2024 Reply Comments on Track 1 Proposals - Resource Adequacy (R.23-10-011)
Filing 03/25/2024, 8:41 AM
R.20-01-007 Order instituting rulemaking - safe reliable gas systems Mar 13, 2024 Comments on the Assigned Commissioner's Ruling (R.20-01-007)
Filing 03/14/2024, 8:53 AM
R.23-10-011 Order Instituting Rulemaking - Oversee Resource Adequacy Program Mar 8, 2024 Opening Comments on Track 1 Proposals - Resource Adequacy (R.23-10-011)
Filing 03/11/2024, 9:52 AM
R.23-05-018 Order instituting rulemaking - update and amend commission general order 131-D Feb 26, 2024 Reply Comments on Administrative Law Judges’ Ruling Inviting Comment on Phase 2 Issues - General Order 131-D (R.23-05-018)
Filing 02/27/2024, 1:48 PM
R.23-10-011 Order Instituting Rulemaking - Oversee Resource Adequacy Program Feb 23, 2024 Revised Slice of Day Proposal - Resource Adequacy Program (R.23-10-011)
Filing 02/26/2024, 8:29 AM
R.20-05-003 Order instituting rulemaking - continue electric integrated resource planning and related procurement processes Feb 5, 2024 Reply Comments on Proposed Decision - Integrated Resource Planning (R.20-05-003)
Filing 02/06/2024, 9:38 AM
R.20-05-003 Order instituting rulemaking - continue electric integrated resource planning and related procurement processes Jan 30, 2024 Comments on Proposed Decision - Integrated Resource Planning (R.20-05-003)
Filing 01/31/2024, 8:36 AM
R.23-10-011 Order Instituting Rulemaking - Oversee Resource Adequacy Program Jan 19, 2024 Track 1 Proposals - Resource Adequacy Program (R.23-10-011)
Filing 01/19/2024, 3:28 PM
R.20-05-003 Order instituting rulemaking - continue electric integrated resource planning and related procurement processes Dec 1, 2023 Reply Comments on ALJ Ruling on Proposed 2023 Preferred System Plan and TPP Portfolios - Integrated Resource Planning (R.20-05-003)
Filing 12/04/2023, 9:01 AM
R.23-10-011 Order Instituting Rulemaking - Oversee Resource Adequacy Program Nov 20, 2023 Reply Comments on OIR - Resource Adequacy Program (R.23-10-011)
Filing 11/21/2023, 8:41 AM
R.23-05-018 Order instituting rulemaking - update and amend commission general order 131-D Nov 20, 2023 Reply Comments on Proposed Decision Addressing Phase 1 Issues - General Order 131-D (R.23-05-018)
Filing 11/21/2023, 8:41 AM
R.23-05-018 Order instituting rulemaking - update and amend commission general order 131-D Nov 15, 2023 Opening Comments on Proposed Decision Addressing Phase 1 Issues - General Order 131-D (R.23-05-018)
Filing 11/16/2023, 9:02 AM
R.23-05-018 Order instituting rulemaking - update and amend commission general order 131-D Nov 13, 2023 Reply Comments on Joint Motion for Adoption of Phase 1 Settlement Agreement - General Order 131-D (R.23-05-018)
Filing 11/14/2023, 8:21 AM
R.20-05-003 Order instituting rulemaking - continue electric integrated resource planning and related procurement processes Nov 13, 2023 Comments on ALJ Ruling on Proposed 2023 Preferred System Plan and TPP Portfolios - Integrated Resource Planning (R.20-05-003)
Filing 11/14/2023, 8:21 AM
R.23-10-011 Order Instituting Rulemaking - Oversee Resource Adequacy Program Nov 8, 2023 Opening Comments on OIR - Resource Adequacy Program (R.23-10-011)
Filing 11/08/2023, 1:19 PM
R.23-05-018 Order instituting rulemaking - update and amend commission general order 131-D Oct 30, 2023 Opening Comments on Joint Motion for Adoption of Phase 1 Settlement Agreement - General Order 131-D (R.23-05-018)
Filing 10/31/2023, 8:02 AM
R.20-01-007 Order instituting rulemaking - safe reliable gas systems Oct 17, 2023 Comments on Proposed Decision - Safe and Reliable Gas Systems (R.20-01-007)
Filing 10/17/2023, 2:43 PM
R.21-10-002 order instituting rulemaking - oversee RA program, consider reforms and refinement, and forward RA obligations Sep 25, 2023 Response to the California Large Energy Consumers Association’s Petition for Modification - Resource Adequacy Program (R.21-10-002)
Filing 09/26/2023, 8:21 AM
R.15-03-011 Order instituting rulemaking - energy storage procurement framework and design program Sep 19, 2023 Comments on Proposed Decision - Energy Storage (R.15-03-011)
Filing 09/20/2023, 8:09 AM
R.20-05-003 Order instituting rulemaking - continue electric integrated resource planning and related procurement processes Sep 5, 2023 Response to Joint Motion for All-Party Meeting (R.20-05-003)
Filing 09/06/2023, 9:13 AM
R.23-05-018 Order instituting rulemaking - update and amend commission general order 131-D Jul 7, 2023 Reply Comments - Rulmaking to Update and Amend General Order 131-D (R.23-05-018)
Filing 07/10/2023, 7:57 AM
R.23-05-018 Order instituting rulemaking - update and amend commission general order 131-DR.23-05-018 - Order Instituting Rulemaking to Update and Amend Commission General Order 131-D Jun 22, 2023 Opening Comments on OIR to Update and Amend Commission General Order 131D - General Order 131D (R.23-05-018)
Filing 06/23/2023, 9:01 AM
R.21-10-002 order instituting rulemaking - oversee RA program, consider reforms and refinement, and forward RA obligations Jun 19, 2023 Reply Comments on Proposed Decision - Resource Adequacy Program (R.21-10-002)
Filing 06/20/2023, 8:04 AM
R.21-10-002 order instituting rulemaking - oversee RA program, consider reforms and refinement, and forward RA obligations Jun 14, 2023 Opening Comments on Proposed Decision - Resource Adequacy Program (R.21-10-002)
Filing 06/15/2023, 8:53 AM
R.21-06-017 Order instituting rulemaking - modernize the electric grid for high distributed energy resources Jun 5, 2023 Reply Comments on ALJ's Ruling Directing Responses to Questions on Track 1 Phase 1 - High Distributed Energy Resources (R.21-06-017)
Filing 06/05/2023, 2:04 PM
R.11-09-011 Order instituting rulemaking - Commission's own motion to improve dist level interconnection rules and regs for elec storage May 24, 2023 Comments on Proposed Decision - Net Energy Metering (R.11-09-011)
Filing 05/24/2023, 1:41 PM
R.21-06-017 Order instituting rulemaking - modernize the electric grid for high distributed energy resources May 22, 2023 Comments on ALJ's Ruling Directing Responses to Questions on Track 1 Phase 1 - High Distributed Energy Resources (R.21-06-017)
Filing 05/22/2023, 2:55 PM
R.21-10-002 order instituting rulemaking - oversee RA program, consider reforms and refinement, and forward RA obligations May 17, 2023 Final 2024 Flexible Capacity Needs Assessment and Availability Assessment Hours - Resource Adequacy Program (R.21-10-002)
Filing 05/19/2023, 9:48 AM
R.21-10-002 order instituting rulemaking - oversee RA program, consider reforms and refinement, and forward RA obligations May 12, 2023 Reply Comments on Final 2024 Local Capacity Technical Report - Resource Adequacy Program (R.21-10-002)
Filing 05/12/2023, 10:56 AM
R.21-10-002 order instituting rulemaking - oversee RA program, consider reforms and refinement, and forward RA obligations May 1, 2023 Notice of Availability 2024 Final Local Capacity Technical Study and Update for 2023 Flexible Capacity Needs Assessment (R.21-10-002)
Filing 05/02/2023, 9:20 AM
R.21-10-002 order instituting rulemaking - oversee RA program, consider reforms and refinement, and forward RA obligations Apr 6, 2023 Draft 2024 Local Capacity Technical Report - Resource Adequacy Program (R.21-10-002)
Filing 04/06/2023, 2:17 PM
R.21-10-002 order instituting rulemaking - oversee RA program, consider reforms and refinement, and forward RA obligations Apr 4, 2023 Notice of Ex Parte Meeting - Resource Adequacy Program (R.21-10-002)
Filing 04/05/2023, 8:14 AM
R.21-10-002 order instituting rulemaking - oversee RA program, consider reforms and refinement, and forward RA obligations Mar 28, 2023 Reply Comments on the Proposed Decision on Phase 2 of the Resource Adequacy Reform Track - Resource Adequacy Program (R.21-10-002)
Filing 03/29/2023, 8:19 AM
R.21-10-002 order instituting rulemaking - oversee RA program, consider reforms and refinement, and forward RA obligations Mar 27, 2023 Notice of Ex Parte Meeting - Resource Adequacy Program (R.21-10-002)
Filing 03/28/2023, 8:11 AM
No results
Show more
View all orders instituting rulemaking

Orders instituting investigation

Topic Title Type Posted
I.23-03-008 Order instituting investigation - natural gas prices during winter 2022-2023 Apr 19, 2023 CAISO Comments - Order Instituting Investigation regarding Natural Gas Prices during Winter 2022-2023 (I.23-03-008)
Filing 04/20/2023, 8:27 AM
I.17-02-002 Order instituting investigation - minimizing or eliminating use of Aliso Canyon natural gas storage facility Apr 27, 2022 Notice of Ex Parte Meeting - AlisoCanyon (I.17-02-002)
Filing 04/27/2022, 1:21 PM
I.17-02-002 Order instituting investigation - minimizing or eliminating use of Aliso Canyon natural gas storage facility Apr 19, 2022 Three-Day Notice of Ex Parte Meeting - Aliso Canyon (I.17-02-002)
Filing 04/20/2022, 9:01 AM
I.17-02-002 Order instituting investigation - minimizing or eliminating use of Aliso Canyon natural gas storage facility Feb 16, 2022 Comments on Ruling Entering Phase 3 Report Into the Record - Aliso Canyon (I.17-02-002)
Filing 02/17/2022, 8:23 AM
I.17-02-002 Order instituting investigation - minimizing or eliminating use of Aliso Canyon natural gas storage facility Nov 24, 2021 Notice of Ex Parte Meeting - Aliso Canyon, Integrated Resource Planning, Resource Adequacy (I.17-02-002, R.20-05-003, R.21-10-002)
Filing 11/24/2021, 6:03 PM
I.17-02-002 Order instituting investigation - minimizing or eliminating use of Aliso Canyon natural gas storage facility Nov 16, 2021 Three-Day Notice of Ex Parte Meeting - Aliso Canyon, Integrated Resource Planning, Resource Adequacy (I.17-02-002, R.20-05-003, and R.21-10-002)
Filing 11/18/2021, 2:20 PM
I.17-02-002 Order instituting investigation - minimizing or eliminating use of Aliso Canyon natural gas storage facility Nov 10, 2021 Comments on the Nov 3 Workshop - Aliso Canyon (I.17-02-002)
Filing 11/10/2021, 4:41 PM
I.17-02-002 Order instituting investigation - minimizing or eliminating use of Aliso Canyon natural gas storage facility Oct 28, 2021 Notice of Ex Parte Communication - Aliso Canyon (I.17-02-002)
Filing 10/29/2021, 10:20 AM
I.17-02-002 Order instituting investigation - minimizing or eliminating use of Aliso Canyon natural gas storage facility Oct 20, 2021 Three Day Notice of Ex Parte Communication - Aliso Canyon (I.17-02-002)
Filing 10/20/2021, 2:28 PM
I.17-02-002 Order instituting investigation - minimizing or eliminating use of Aliso Canyon natural gas storage facility Aug 23, 2021 Notice of Ex Parte Communication - Aliso Canyon (I.17-02-002)
Filing 08/24/2021, 8:48 AM
I.17-02-002 Order instituting investigation - minimizing or eliminating use of Aliso Canyon natural gas storage facility Aug 17, 2021 Three-Day Notice of Ex Parte Communication - Aliso Canyon (I.17-02-002)
08/20/2021, 8:29 AM
I.17-02-002 Order instituting investigation - minimizing or eliminating use of Aliso Canyon natural gas storage facility Apr 20, 2021 Comments - Phase 3 Workshop 2 - Aliso Canyon (I.17-02-002)
Order 04/21/2021, 8:16 AM
I.17-02-002 Order instituting investigation - minimizing or eliminating use of Aliso Canyon natural gas storage facility Mar 24, 2020 Opening Comments on Hydraulic Modeling Simulations and Sensitivity Cases - Aliso Canyon OII (I.17-02-002)
Comment 03/24/2020, 2:52 PM
I.17-02-002 Order instituting investigation - minimizing or eliminating use of Aliso Canyon natural gas storage facility Jan 31, 2020 Opening Comments - Aliso Canyon (I.17-02-002)
01/31/2020, 4:18 PM
I.19-11-013 Order instituting investigation - late 2019 public safety power shutoff events Nov 13, 2019 Order Instituting Investigation - Late 2019 Public Safety Power Shutoff Events (I.19-11-013)
Order 11/14/2019, 1:03 PM
I.17-02-002 Order instituting investigation - minimizing or eliminating use of Aliso Canyon natural gas storage facility Feb 9, 2017 Order Instituting Investigation - Minimize or Eliminate Aliso Canyon Natural Gas Storage Facility (I.17-02-002)
Order 02/21/2017, 9:14 AM
No results
Show more
View all orders instituting investigation.

Applications of approval

Topic Title Type Posted
A.24-05-014 Application of LS Power Grid California, LLC for a Certificate of Public Convenience and Necessity Authorizing Construction of the Power the South Bay Project June 14, 2024 Motion for Party Status-Power the South Bay Project (A. 24-05-014)
Motion 06/17/2024, 9:59 AM
A.24-04-017 Application of LS Power Grid California, LLC for a Certificate of Public Convenience and Necessity Authorizing Construction of the Power Santa Clara Valley Project June 14, 2024 Motion for Party Status-Power Santa Clara Valley Project (A. 24-04-017)
Motion 06/17/2024, 9:59 AM
A.22-05-022 - PG&E Application - Green Tariff, Community Solar Green Tariff and Green Tariff Shared Renewables Programs Nov 27, 2023 Comments on ALJ Ruling - Community Solar Green Tariff (A.22-05-022)
Filing 11/28/2023, 8:13 AM
A.22-05-022 - PG&E Application - Green Tariff, Community Solar Green Tariff and Green Tariff Shared Renewables Programs Nov 27, 2023 Motion for Party Status - Community Solar Green Tariff (A.22-05-022)
Filing 11/28/2023, 8:13 AM
A.17-01-023 - Joint application of Horizon West Transmission and Pacific Gas & Electric Company for Estrella substation Sep 1, 2023 Opening Testimony of Jeff Billinton on behalf of CAISO - Estrella Substation (A.17-01-023)
Filing 09/05/2023, 8:47 AM
A.22-5-002 PG&E Application - Approval of its Demand Response Programs, Pilots and Budgets for Program Years 2023-2027 Apr 14, 2023 Reply Comments on Demand Response Application - Approval of Demand Response Programs, Pilots, and Budgets (A.22-05-002)
Filing 04/14/2023, 2:00 PM
A.22-5-002 PG&E Application - Approval of its Demand Response Programs, Pilots and Budgets for Program Years 2023-2027 Apr 14, 2023 Motion for Party Status - Approval of Demand Response Programs, Pilots, and Budgets (A.22-05-002)
Filing 04/14/2023, 2:00 PM
A.17-01-023 - Joint application of Horizon West Transmission and Pacific Gas & Electric Company for Estrella substation Jun 2, 2022 Motion for Party Status - Estrella Substation (A.17-01-023)
Filing 06/03/2022, 8:41 AM
A.16-10-012 - DCR Transmission LLC - certificate of public convenience and necessity - Ten West Link Project Dec 21, 2021 Response to Rehearing Request - Ten West Link (A.16-10-012)
Filing 12/22/2021, 8:23 AM
A.16-10-012 - DCR Transmission LLC - certificate of public convenience and necessity - Ten West Link Project Oct 26, 2021 Reply Comments on the Proposed Decision Granting a Certificate of Public Convenience and Necessity - Ten West Link (A.16-10-012)
Comment 10/27/2021, 8:22 AM
A.16-10-012 - DCR Transmission LLC - certificate of public convenience and necessity - Ten West Link Project Oct 21, 2021 Opening Comments on the Proposed Decision Granting a Certificate of Public Convenience and Necessity - Ten West Link (A.16-10-012)
Comment 10/22/2021, 8:20 AM
A.16-10-012 - DCR Transmission LLC - certificate of public convenience and necessity - Ten West Link Project Sep 20, 2021 Notice of Ex Parte Communication - Ten West Link Project (A.16-10-012)
Filing 09/21/2021, 9:13 AM
A.16-10-012 - DCR Transmission LLC - certificate of public convenience and necessity - Ten West Link Project Sept 13, 2021 Three Day Notice of Ex Parte Meeting - Ten West Link Project (A.16-10-012)
Filing 09/14/2021, 8:19 AM
A.16-10-012 - DCR Transmission LLC - certificate of public convenience and necessity - Ten West Link Project Jul 23, 2021 Additional Brief - Ten West Link (A.16-10-012)
Filing 07/23/2021, 4:27 PM
A.16-10-012 - DCR Transmission LLC - certificate of public convenience and necessity - Ten West Link Project Mar 12, 2021 Reply Brief - Ten West Link (A.16-10-012)
Filing 03/15/2021, 8:23 AM
A.20-04-013 - PG&E application - approval and recovery - Oakland Clean Energy Initiative Preferred Portfolio Costs Dec 4, 2020 Reply Brief - Oakland Clean Energy Initiative (A.20-04-013)
Filing 12/04/2020, 3:10 PM
A.19-11-018 - Application of Southern California Gas Company - adoption of 2020 Flex Alert Marketing Campaign Dec 2, 2020 Opening Comments on the Proposed Decision - Flex Alert Marketing Campaign (A.19-11-018)
Comment 12/04/2020, 8:37 AM
A.20-04-013 - PG&E application - approval and recovery - Oakland Clean Energy Initiative Preferred Portfolio Costs Nov 12, 2020 Opening Brief - Oakland Clean Energy Initiative (A.20-04-013)
Filing 11/13/2020, 8:29 AM
A.18-05-007 - certificate of public convenience and necessity - Eldorado-Lugo-Mohave series capacitor project Oct 20, 2020 Response to Wild Tree Foundation's Application for Rehearing - Eldorado-Lugo-Mohave Capacitor Project (A.18-05-007)
Filing 10/21/2020, 3:43 PM
A.20-04-013 - PG&E application - approval and recovery - Oakland Clean Energy Initiative Preferred Portfolio Costs Sep 2, 2020 Motion for Party Status - Oakland Clean Energy Initiative (A.20-04-013)
Motion 09/03/2020, 9:30 AM
A.18-05-007 - certificate of public convenience and necessity - Eldorado-Lugo-Mohave series capacitor project Aug 17, 2020 Reply Comments on the Proposed Decision - Eldorado-Lugo-Mohave Capacitor Project (A.18-05-007)
Filing 08/18/2020, 8:29 AM
A.18-05-007 - certificate of public convenience and necessity - Eldorado-Lugo-Mohave series capacitor project Aug 17, 2020 Response to the Public Advocates Office's Motions - Eldoraho-Lugo-Mohave Capacitor Project (A.18-05-007)
Filing 08/18/2020, 8:29 AM
A.18-05-007 - certificate of public convenience and necessity - Eldorado-Lugo-Mohave series capacitor project Aug 11, 2020 Opening Comments on Proposed Decision for Eldorado Lugo Mohave Capacitor Project (A.18-05-007)
Filing 08/11/2020, 1:53 PM
A.16-10-012 - DCR Transmission LLC - certificate of public convenience and necessity - Ten West Link Project Jun 18, 2020 Rebuttal Testimony of Nebiyu Yimer - DCR Transmission (Ten West Link Project) A.16-10-012
Testimony 06/19/2020, 8:52 AM
A.16-10-012 - DCR Transmission LLC - certificate of public convenience and necessity - Ten West Link Project Jun 18, 2020 Rebuttal Testimony of Yi Zhang - DCR Transmission (Ten West Link Project) A.16-10-012
Testimony 06/19/2020, 8:52 AM
A.16-10-012 - DCR Transmission LLC - certificate of public convenience and necessity - Ten West Link Project Jun 18, 2020 Rebuttal Testimony of Neil Millar DCR Transmission (Ten West Link Project) A.16-10-012
Testimony 06/19/2020, 8:52 AM
A.16-10-012 - DCR Transmission LLC - certificate of public convenience and necessity - Ten West Link Project Feb 26, 2020 Response to the Public Advocates Office Motion to Strike - Ten West Link (A.16-10-012)
Response 02/27/2020, 8:02 AM
A.15-04-013 SCE application - certificate of public convenience and necessity - Riverside transmission project Feb 6, 2020 Opening Comments on Proposed Decision - Riverside Transmission Reliability Project (A.15-04-013)
Comment 02/06/2020, 4:08 PM
A.18-05-007 - certificate of public convenience and necessity - Eldorado-Lugo-Mohave series capacitor project Jan 16, 2020 Opening Brief - Eldorado-Lugo-Mojave Series Capacitor Project (A.18-05-007)
Report 01/17/2020, 8:27 AM
A.16-10-012 - DCR Transmission LLC - certificate of public convenience and necessity - Ten West Link Project Dec 20, 2019 Testimony of Nebiyu Yimer - DCR Transmission (Ten West Link Project) - CPCN (A.16-10-012)
Testimony 12/20/2019, 4:41 PM
A.16-10-012 - DCR Transmission LLC - certificate of public convenience and necessity - Ten West Link Project Dec 20, 2019 Testimony of Yi Zhang - DCR Transmission (Ten West Link Project) - CPCN (A.16-10-012) - _A1610012
Testimony 12/20/2019, 4:41 PM
A.16-10-012 - DCR Transmission LLC - certificate of public convenience and necessity - Ten West Link Project Dec 20, 2019 Testimony of Neil Millar -DCR Transmission (Ten West Link Project) - CPCN (A.16-10-012)
Testimony 12/20/2019, 4:41 PM
A.18-05-007 - certificate of public convenience and necessity - Eldorado-Lugo-Mohave series capacitor project Nov 18, 2019 Rebuttal Testimony of Sushant Barave - Eldorado-Lugo-Mohave Series Capacitor Project (A.18-05-007)
Testimony 11/20/2019, 8:34 AM
A.18-05-007 - certificate of public convenience and necessity - Eldorado-Lugo-Mohave series capacitor project Nov 18, 2019 Rebuttal Testimony of Neil Millar - Eldorado-Lugo-Mohave Series Capacitor Project (A.18-05-007)
Testimony 11/20/2019, 8:34 AM
A.18-05-007 - certificate of public convenience and necessity - Eldorado-Lugo-Mohave series capacitor project Nov 13, 2019 ALJ ruling denying motion to modify prodecural schedule (A.18-05-007)
Order 11/14/2019, 1:03 PM
A.18-05-007 - certificate of public convenience and necessity - Eldorado-Lugo-Mohave series capacitor project Nov 5, 2019 Motion to modify procedural schedule - evidentiary hearings (A.18-05-007)
Motion 11/06/2019, 3:13 PM
A.18-05-007 - certificate of public convenience and necessity - Eldorado-Lugo-Mohave series capacitor project Nov 4, 2019 Testimony of Neil Millar - Eldorado-Lugo-Mohave Series Capacitor Project (A.18-05-007)
Testimony 11/05/2019, 9:57 AM
A.18-05-007 - certificate of public convenience and necessity - Eldorado-Lugo-Mohave series capacitor project Nov 4, 2019 Testimony of Sushant Barave - Eldorado-Lugo-Mohave Series Capacitor Project (A.18-05-007)
Testimony 11/05/2019, 9:57 AM
A.15-04-013 SCE application - certificate of public convenience and necessity - Riverside transmission project Oct 18, 2019 Reply Brief - Riverside Transmission Project (A.15-04-013)
Filing 10/18/2019, 4:04 PM
A.15-04-013 SCE application - certificate of public convenience and necessity - Riverside transmission project Sep 27, 2019 Opening Brief - Certificate of Public Convenience and Necessity - Riverside Transmission Reliability Projetc (A.15-04-013)
Filing 09/27/2019, 4:11 PM
A.17-01-012 (related to A.17-01-018 and A.17-01-019) utility applications for approval of demand response programs Aug 30, 2019 Reply Comments on Demand Response Auction Mechanism Working Group Report - Utility Applications for Approval of Demand Response Program (A.17-01-012)
Filing 08/30/2019, 5:21 PM
A.15-04-013 SCE application - certificate of public convenience and necessity - Riverside transmission project Jun 24, 2019 Testimony of John Phipps - Riverside Transmission Reliability Project (A.15-04-013)
Testimony 08/26/2019, 11:09 AM
A.17-01-012 (related to A.17-01-018 and A.17-01-019) utility applications for approval of demand response programs Aug 23, 2019 Comments on Demand Response Auction Mechanism Working Group - Utility Applications for Approval of Demand Response Program (A.17-01-012)
Filing 08/23/2019, 4:50 PM
A.12-08-007 (consol. with A.12-08-008, A.12-08-009, and A.12-08-010) applications for approval of statewide marketing, education, and outreach programs and budgets Jun 27, 2019 Opening Comments on the Proposed Decision and Alternative Proposed Decision - Flex Alert Funding (A.12-08-007)
Filing 06/27/2019, 4:21 PM
A.17-01-012 (related to A.17-01-018 and A.17-01-019) utility applications for approval of demand response programs Apr 10, 2019 Reply Comments in Response to Questions by ALJ re Demand Response Auction Mechanism - Utility Applications for Approval of Demand Response Programs (A.17-01-012)
Filing 06/21/2019, 8:06 AM
A.17-01-012 (related to A.17-01-018 and A.17-01-019) utility applications for approval of demand response programs Jun 20, 2019 Opening Comments on the Proposed Decision - Utility Applications for Approval of Demand Response Programs (A.17-01-012)
Filing 06/21/2019, 8:06 AM
A.14-06-021 (related to A.14-12-017) SCE and SDG&E application - Operational Flow Order and Emergency Flow Order Requirements May 20, 2019 Comments on the Proposed Decision - Operational Flow Order and Revise Natural Gas Rates (A.14-06-021 and A.14-12-017)
Filing 05/20/2019, 3:59 PM
A.12-08-007 (consol. with A.12-08-008, A.12-08-009, and A.12-08-010) applications for approval of statewide marketing, education, and outreach programs and budgets May 1, 2019 Comments on 2019 Additional Funding for the Flex Alert Program (A.12-08-007)
Comment 05/03/2019, 4:29 PM
A.17-01-012 (related to A.17-01-018 and A.17-01-019) utility applications for approval of demand response programs Mar 29, 2019 Comments in Response to Questions by ALJ re Demand Response Auction Mechanism - Utility Application for Demand Response Program (A.17-01-012)
Filing 04/01/2019, 8:14 AM
A.15-03-003 SCE application - permit to construct electrical substation Mesa Loop facilities Jan 31, 2017 Reply Comments on the Station Power Joint Report and the Staff Proposal (R.15-03-011)
Filing 01/31/2017, 4:40 PM
No results
Show more
View all applications of approval.