Recent Federal Energy Regulatory Commission (FERC) filings

Title Type Posted
Apr 3, 2026 Supplemental Answer to Motion to Compel of DCR Transmission (ER23-2309, et. al.) Filing 04/03/2026, 3:04 PM
Apr 3, 2026 WEIM Readiness Certification for Power Watch (ER15-861) 04/03/2026, 12:42 PM
Apr 3, 2026 WEIM Readiness Certification for Black Hills (ER15-861) 04/03/2026, 12:42 PM
Apr 2, 2026 CAISO Answer to Motion to Compel of DCR Transmission (ER23-2309, et. al.) Filing 04/03/2026, 9:08 AM
Mar 18, 2026 Certificate of Concurrence - Upgraded Facilities Agreement between CAISO, SCE and Olympus (ER26-1860) Filing 03/18/2026, 1:37 PM
Mar 9, 2026 Motion for Leave to File Answer and Answer to Comments - EDAM/DAME Supportive Tariff Revisions (ER26-1294) Motion, Filing 03/09/2026, 2:06 PM
Mar 9, 2026 Informational Filing - February 2026 Negotiated Default Energy Bids, Opportunity Cost Adders, and Variable Operations and Maintenance Adder Informational Report (ER06-615) Filing 03/09/2026, 2:06 PM
Mar 3, 2026 Tariff Amendment - Resource Adequacy Modeling and Program Design Initiative - Track 1 and 3A (ER26-1593) Filing 03/03/2026, 1:11 PM
Mar 2, 2026 Request for Rehearing - DCR Transmission (ER23-2309, ER24-1394, and EL26-34) Filing 03/03/2026, 10:22 AM
Feb 27, 2026 Notice of Cancellation - EIM Implementation Agreement between CAISO and WAPA (ER26-1554) Filing 02/27/2026, 4:42 PM
Feb 27, 2026 Notice of Cancellation - EIM Implementation Agreement between CAISO and Turlock (ER26-1553) Filing 02/27/2026, 4:42 PM
Feb 27, 2026 Notice of Cancellation - EIM Implementation Agreement between CAISO and Tucson (ER26-1552) Filing 02/27/2026, 4:42 PM
Feb 27, 2026 Notice of Cancellation - EIM Implementation Agreement between CAISO and Salt River Project (ER26-1550) Filing 02/27/2026, 4:41 PM
Feb 27, 2026 Notice of Cancellation - EIM Implementation Agreement between CAISO and Tacoma (ER26-1549) Filing 02/27/2026, 4:41 PM
Feb 27, 2026 Notice of Cancellation - EIM Implementation Agreement between CAISO and Seattle City Light (ER26-1546) Filing 02/27/2026, 4:41 PM
Feb 27, 2026 Notice of Cancellation - EIM Implementation Agreement between CAISO and Public Service Co. of New Mexico (ER26-1544) Filing 02/27/2026, 4:40 PM
Feb 27, 2026 Notice of Cancellation - EIM Implementation Agreement between CAISO and PowerEx (ER26-1542) Filing 02/27/2026, 4:40 PM
Feb 27, 2026 Notice of Cancellation - EIM Implementation Agreement between CAISO and NorthWestern Energy (ER26-1541) Filing 02/27/2026, 4:39 PM
Feb 27, 2026 Notice of Cancellation - EIM Implementation Agreement between CAISO and LADWP (ER26-1540) Filing 02/27/2026, 4:39 PM
Feb 27, 2026 Notice of Cancellation - EIM Implementation Agreement between CAISO and El Paso (ER26-1539) Filing 02/27/2026, 4:38 PM
Feb 27, 2026 Notice of Cancellation - EIM Implementation Agreement between CAISO and Bonneville Power Administration (ER26-1537) Filing 02/27/2026, 4:38 PM
Feb 27, 2026 Notice of Cancellation - EIM Implementation Agreement between CAISO and Avista (ER26-1536) Filing 02/27/2026, 4:38 PM
Feb 27, 2026 Notice of Cancellation - EIM Implementation Agreement between CAISO and Avangrid (ER26-1535) Filing 02/27/2026, 4:37 PM
Feb 19, 2026 Motion to Intervene and Comment - DCR Transmission (ER23-2309, ER24-1394, and EL26-34) Filing 02/20/2026, 8:18 AM
Feb 13, 2026 Answer Opposing Petition for Waiver - North Rosamond Solar, LLC Petition for Limited Waiver (ER26-1128) Filing 02/13/2026, 3:49 PM
Feb 9, 2026 Informational Filing - January 2026 Negotiated Default Energy Bids, Opportunity Cost Adders, and Variable Operations and Maintenance Adder Informational Report (ER06-615) Filing 02/09/2026, 9:35 AM
Feb 6, 2026 Tariff Amendment to Support Implementation of DAME/EDAM Initiative (ER26-1294) Filing 02/06/2026, 2:26 PM
Feb 5, 2026 Answer to Appeal of Sanctions - Terminus Hydroelectric, LLC v. CAISO (EL26-41) Answer, Filing 02/05/2026, 11:15 AM
Feb 4, 2026 Unopposed Joint Expedited Motion for Extension of Procedural Schedule and Adoption of Procedural Schedule - DCR Transmission (ER23-2309, ER24-1394, and EL26-34) Filing 02/05/2026, 8:00 AM
Feb 4, 2026 Answer to Comments - Order No. 1920 Compliance Filing (ER26-704) Filing 02/04/2026, 11:59 AM
Jan 31, 2026 Emergency Motion to Suspend Examination of Witnesses - DCR Transmission (ER23-2309, ER24-1394, and EL26-34) Motion, Filing 02/02/2026, 8:48 AM
Jan 23, 2026 Certificate of Concurrence - Large Generator Interconnection Agreement between CAISO, Power Co. of Wyoming and TransWest (ER26-1119) Filing 01/23/2026, 1:53 PM
Jan 23, 2026 Termination of Hosted Advanced Network Application Service Agreement between CAISO and El Paso (ER26-1113) Filing 01/23/2026, 1:47 PM
Jan 23, 2026 Extended Day-Ahead Market - Load Serving Entity Agreement between CAISO and Bonneville Power Administration (ER26-1112) Filing 01/23/2026, 1:08 PM
Jan 20, 2026 ISO/RTO Council Comments on Notice of Proposed Rulemaking (RM96-1-044) Filing, Comment 01/20/2026, 12:20 PM
Jan 12, 2026 Amendment 2 to the Metered Subsystem Aggregator Agreement with Northern California Power Agency (ER26-1016) Filing 01/12/2026, 5:11 PM
Jan 7, 2026 Informational Filing - December 2025 Negotiated Default Energy Bids, Opportunity Cost Adders, and Variable Operations and Maintenance Adder Informational Report (ER06-615) 01/07/2026, 10:48 AM
Jan 6, 2026 - Answer to Yolo County Answer - County of Yolo v. CAISO (EL26-28) Answer, Filing 01/06/2026, 2:49 PM
Jan 6, 2026 Answer to Motion for Default Order - County of Yolo v. CAISO (EL26-28) Answer, Filing 01/06/2026, 2:49 PM
Dec 19, 2025 Motion for Leave to Intervene and File Answer and Answer - SCE Letter Agreement re Longroad Filing 12/19/2025, 2:35 PM
Dec 12, 2025 Amendment to Adjacent Balancing Authority Operating Agreement between CAISO and Salt River Project (ER26-748) Filing 12/12/2025, 4:57 PM
Dec 11, 2025 Answer to Complaint - County of Yolo v. CAISO (EL26-28) Filing 12/12/2025, 9:34 AM
Dec 9, 2025 Tariff Amendment - Order No. 1920 Compliance Filing (ER26-704) Filing 12/09/2025, 4:22 PM
Dec 8, 2025 Informational Filing - November 2025 Negotiated Default Energy Bids, Opportunity Cost Adders, and Variable Operations and Maintenance Adder Informational Report (ER06-615) Filing 12/08/2025, 9:31 AM
Nov 21, 2025 Comments on the Advanced Notice of Proposed Rulemaking - Interconnection of Large Loads to the Interstate Transmission System (RM26-4) Filing, Comment 11/21/2025, 3:30 PM
Nov 17, 2025 Informational Filing of Effective Date - SunZia South (ER25-344) Filing 11/17/2025, 2:31 PM
Nov 17, 2025 Informational Filing of Effective Date - SunZia North (ER25-345) Filing 11/17/2025, 2:31 PM
Nov 7, 2025 Informational Filing - October 2025 Negotiated Default Energy Bids, Opportunity Cost Adders, and Variable Operations and Maintenance Adder Informational Report (ER06-615) Filing 11/10/2025, 12:43 PM
Oct 24, 2025 Supplemental Compliance Filing regarding NAESB Standards Version 4 (ER25-2603) Filing 10/24/2025, 1:10 PM
Oct 14, 2025 CAISO's Supportive Comments on MATL LLP's Open Access Transmission Tariff (ER25-3481) Filing 10/14/2025, 1:40 PM
No results
View previous FERC filings.

Recent California Public Utilities Commission (CPUC) filings

Title Type Posted
Apr 3, 2026 Draft 2027 Local Capacity Technical Report - Resource Adequacy Program (R.25-10-003) Report, Filing 04/03/2026, 11:37 AM
Mar 31, 2026 Motion to Adjust the Track 1 Schedule for Local Capacity Technical Analysis and Flexible Capacity Needs Assessment for 2027 - Resource Adequacy Program (R.25-10-003) Motion, Filing 03/31/2026, 4:51 PM
Mar 20, 2026 Reply Comments on Track 1 Proposals - Resource Adequacy Program (R.25-10-003) Filing, Comment 03/20/2026, 4:32 PM
Mar 6, 2026 Opening Comments on Track 1 Proposals - Resource Adequacy Program (R.25-10-003) Filing, Comment 03/09/2026, 8:50 AM
Feb 26, 2026 Motion for Party Status - Collinsville 500/230 kV Substation Project (A.24-07-018) Filing 02/26/2026, 12:40 PM
Feb 11, 2026 Reply Comments on Proposed Decision Requiring 2029-2032 Electric Resource Procurement and Transmitting Portfolios for 2026-2027 Transmission Planning Process - Integrated Resource Planning (R.25-06-019) Filing 02/11/2026, 4:35 PM
Feb 6, 2026 Opening Comments on Proposed Decision Requiring 2029-2032 Electric Resource Procurement and Transmitting Portfolios for 2026-2027 Transmission Planning Process - Integrated Resource Planning (R.25-06-019) Filing, Comment 02/06/2026, 4:21 PM
Jan 23, 2026 Track 1 Proposals - Resource Adequacy Program (R.25-10-003) Filing 01/23/2026, 3:54 PM
Nov 26, 2025 Motion for Party Status - Ironwood Transmission Line Project (A.25-09-008) 11/26/2025, 9:56 AM
Nov 13, 2025 Opening Comments on Order Instituting Rulemaking - Demand Response (R.25-09-004) Filing, Comment 11/14/2025, 9:31 AM
Nov 10, 2025 Opening Testimony of Binaya Shrestha - Northern San Joaquin 230 kV Transmission Project (A.23-09-001) Testimony, Filing 11/10/2025, 3:36 PM
Nov 4, 2025 Comments on Order Instituting Rulemaking - Resource Adequacy Program (R.25-10-003) Filing, Comment 11/05/2025, 10:39 AM
Oct 31, 2025 Reply Comments on ALJ Ruling Seeking Comments on Electricity Portfolios for 2026-2027 Transmission Planning Process and Need for Additional Reliability Procurement - Integrated Resource Planning (R.25-06-019) Filing, Comment 11/03/2025, 11:54 AM
Oct 24, 2025 Testimony of Jeff Billinton - Power Santa Clara Valley Project (A. 24-04-017) Testimony, Filing 10/27/2025, 8:55 AM
Oct 22, 2025 Opening Comments on ALJ Ruling Seeking Comments on Electricity Portfolios for 2026-2027 Transmission Planning Process and need for Additional Reliability Procurement - Integrated Resource Planning (R.25-06-019) Filing, Comment 10/23/2025, 9:54 AM
Sep 17, 2025 Motion for Party Status - Integrated Resource Planning (R.25-06-019) Motion, Filing 09/18/2025, 9:53 AM
Aug 5, 2025 Reply Comments on ALJ Ruling Seeking Comments on Reliable and Clean Power Procurement Program Staff Proposal - Integrated Resource Planning (R.20-05-003) Filing, Comment 08/06/2025, 10:26 AM
Jul 15, 2025 Opening Comments - Reliable and Clean Power Procurement Program Proposal (R.20-05-003) Filing 07/15/2025, 4:41 PM
Jul 14, 2025 Motion for Party Status in the Application of Pacific Gas and Electric for a Certificate of Public Convenience and Necessity - Northern San Joaquin 230 kV Transmission Project (A.23-09-001) Filing 07/15/2025, 3:19 PM
Jun 16, 2025 Reply Comments on the Proposed Decision Adopting Local Capacity Obligations for 2026-2028, Flexible Capacity Obligations for 2026, and Program Refinement - Resource Adequacy Program (R.23-10-011) Filing, Comment 06/17/2025, 11:14 AM
Jun 11, 2025 Opening Comments on the Proposed Decision Adopting Local Capacity Obligations for 2026-2028, Flexible Capacity Obligations for 2026, and Program Refinement - Resource Adequacy Program (R.23-10-011) Filing, Comment 06/12/2025, 9:42 AM
May 16, 2025 Notice of Availability of Final 2026 Flexible Capacity Needs Assessment and Availability Assessment Hours - Resource Adequacy Program (R.23-10-011) Report, Filing 05/16/2025, 3:02 PM
May 15, 2025 Notice of Ex Parte Meeting - Resource Adequacy Program (R.23-10-011) Filing 05/15/2025, 10:40 AM
May 7, 2025 Notice of Ex Parte Meeting - Resource Adequacy Program (R.23-10-011) Filing 05/07/2025, 2:36 PM
May 1, 2025 Notice of Availability of Final 2026 Local Capacity Technical Report and Update Regarding 2026 Flexible Capacity Needs Assessment - Resource Adequacy Program (R.23-10-011) Report, Filing 05/01/2025, 11:00 AM
Apr 17, 2025 Motion for Party Status - Manning 500/230 kV Substation Project (A.24-06-017) Motion, Filing 04/17/2025, 3:48 PM
Apr 3, 2025 Draft 2026 Local Capacity Technical Report - Resource Adequacy Program (R.23-10-011) Report, Filing 04/03/2025, 12:03 PM
Mar 25, 2025 CAISO Response Request for Rehearing - General Order 131-D (R.23-05-018) Filing 03/26/2025, 9:22 AM
Mar 17, 2025 Reply Comments on Track 3 Proposals - Resource Adequacy Program (R.23-10-011) 03/18/2025, 12:37 PM
Mar 3, 2025 Opening Comments on Track 3 Proposals - Resource Adequacy Program (R.23-10-011) Filing, Comment 03/04/2025, 8:23 AM
Feb 4, 2025 Reply Comments on the Proposed Decision Transmitting Electricity Resource Portfolios to the CAISO for 2025-2026 Transmission Planning Process - Integrated Resource Planning (R.20-05-003) Filing, Comment 02/05/2025, 12:27 PM
Jan 30, 2025 Opening Comments on the Proposed Decision Transmitting Electricity Resource Portfolios to the CAISO for 2025-2026 Transmission Planning Process - Integrated Resource Planning (R.20-05-003) Filing, Comment 01/31/2025, 9:11 AM
Jan 16, 2025 Opening Comments on Proposed Decision Adopting General Order 131-E - General Order 131-D (R.23-05-018) Filing, Comment 01/17/2025, 10:44 AM
Dec 16, 2024 Opening Comments on Order Instituting Rulemaking - Safe and Reliable Gas Systems (R.24-09-012) Filing, Comment 12/18/2024, 1:42 PM
Dec 6, 2024 Comments on the ALJ Ruling Seeking Comments Regarding Future Grid Study Report - High Distributed Energy Resources (R.21-06-017) Filing, Comment 12/09/2024, 8:41 AM
Dec 3, 2024 Opening Comments on the Proposed Decision Adopting Biennial Assessment Process - Aliso Canyon (I.17-02-002) Filing, Comment 12/04/2024, 9:31 AM
Nov 18, 2024 Opening Comments on the Proposed Decision on Track 2 Issues - Resource Adequacy Program (R.23-10-011) Filing, Comment 11/19/2024, 11:23 AM
Oct 7, 2024 Reply Comments on the ALJ Ruling Seeking Comments on Electricity Resource Portfolios for 2025-2026 Transmission Planning Process - Integrated Resource Planning (R.20-05-003) Filing, Comment 10/08/2024, 12:11 PM
Sep 30, 2024 Opening Comments on the ALJ Ruling Seeking Comments on Electricity Resource Portfolios for 2025-2026 Transmission Planning Process - Integrated Resource Planning (R.20-05-003) Filing, Comment 10/01/2024, 11:22 AM
Sep 16, 2024 Reply Comments on Administrative Law Judge’s Ruling on Revised Slice of Day Calibration Tool and Comment Schedule - Resource Adequacy Program (R.23-10-011) Filing, Comment 09/17/2024, 10:42 AM
Sep 9, 2024 Opening Comments on Administrative Law Judge’s Ruling on Revised Slice of Day Calibration Tool and Comment Schedule - Resource Adequacy Program (R.23-10-011) Filing 09/10/2024, 9:23 AM
Aug 29, 2024 Opening Comments on Proposed Decision Allowing Bridge Resources for Alternative Compliance with Diablo Canyon Replacement Resource Category in D.21-06-035 - Integrated Resource Planning (R.20-05-003) Filing, Comment 08/30/2024, 10:53 AM
Aug 13, 2024 Reply Comments on the Proposed Decision Determining Need for Centralized Procurement of Long Lead-Time Resources - Integrated Resource Planning (R.20-05-003) Filing 08/14/2024, 10:36 AM
Aug 9, 2024 Opening Comments on Track 2 Proposals - Resource Adequacy Program (R.23-10-011) Filing 08/09/2024, 5:40 PM
Aug 8, 2024 Opening Comments on Proposed Decision Determining Need for Centralized Procurement of Long Lead-Time Resources - Integrated Resource Planning (R.20-05-003).pdf Filing, Comment 08/09/2024, 10:01 AM
Jul 15, 2024 Reply Comments on ALJ Ruling Inviting Comment on Phase 2 Staff Proposal and Noticing Workshop (R.23-05-018) Filing, Comment 07/16/2024, 12:02 PM
Jul 1, 2024 Opening Comments on ALJ Ruling Inviting Comment on Phase 2 Staff Proposal - General Order 131-D (R.23-05-018) Filing, Comment 07/02/2024, 12:03 PM
June 14, 2024 Motion for Party Status-Power the South Bay Project (A. 24-05-014) Motion, Filing 06/17/2024, 9:59 AM
June 14, 2024 Motion for Party Status-Power Santa Clara Valley Project (A. 24-04-017) Motion, Filing 06/17/2024, 9:59 AM
Jun 11, 2024 Reply Comments on PD Adopting Local Capacity Obligations, Flexible Capacity Obligations, and Program Refinements - Resource Adequacy Program - R.23-10-011 Filing, Comment 06/12/2024, 9:06 AM
No results
View previous CPUC filings.

Recent California Energy Commission (CEC) filings

Title Type Posted
Mar 16, 2026 Comments on Revised Draft Demand Side Grid Support Program Guidelines, Fifth Edition - Reliability Reserve Incentive Programs (22-RENEW-01) Filing, Comment 03/16/2026, 4:02 PM
Feb 7, 2025 Comments on the Integrated Energy Policy Report Commissioner Workshop on Regional Electricity Markets and Coordination (24-IEPR-01) Filing, Comment 02/10/2025, 9:03 AM
Jan 2, 2025 Comments on the Integrated Energy Policy Report Commissioner Workshop on Draft Forecast Results (24-IEPR-03) Filing, Comment 01/03/2025, 9:22 AM
Nov 30, 2023 Comments on Assembly Bill 209 Publicly Owned Utility Planning Reserve Margin Workshop (21-ESR-01) Filing 12/01/2023, 8:27 AM
Dec 20, 2022 Comments on Qualifying Capacity of Supply Side Demand Response Working Group Draft Report (21-DR-01) Filing 12/21/2022, 8:50 AM
Oct 17, 2022 Comments on Supply-Side Demand Response Working Group Proposals (21-DR-01) Filing 10/19/2022, 8:45 AM
Feb 4, 2022 Comments on Supply-Side Demand Response Working Group Report (21-DR-01) Filing 02/07/2022, 11:00 AM
Dec 17, 2021 Comments on Supply-Side Demand Response Workshop (21-IEPR-04) Filing 12/17/2021, 1:44 PM
Aug 2, 2021 Comments on Supply-Side Demand Response Stakeholder Working Group Process (21-DR-01) Filing 08/03/2021, 3:14 PM
Jul 2, 2021 California ISO Comments - Russell City (01-AFC-7C) Filing 07/02/2021, 2:13 PM
Mar 9, 2020 Comments on Modeling Inputs and Assumptions Workshop - SB-100 Path to Clean Energy Future (19-SB-100) Filing, Comment 03/10/2020, 3:28 PM
Jan 24, 2020 Comments on Draft Scoping Memo - Load Management Rulemaking (19-OIR-01) Comment 01/24/2020, 2:57 PM
Dec 13, 2019 Weather Normalized 2019 Peak Demands and Peak Demands Forecasts for 2020 (19-IEPR-03) Filing 12/16/2019, 8:07 AM
Nov 1, 2019 Briefing on Post-2020 Grid Operational Outlook (19-IEPR-01) Filing 11/01/2019, 1:09 PM
Jan 25, 2019 Comments on the Southern California Natural Gas Prices Joint Workshop - 2018 Integrated Energy Policy Report (18-IEPR-03) Filing 01/30/2019, 2:15 PM
Sep 29, 2017 Comments re Moorpark Sub-Area Local Capacity Alternative Study - Puente Power Project (15-AFC-01) Filing 09/29/2017, 4:11 PM
Sep 7, 2017 Prehearing Conference Statement - Puente Power Project for Moorpark Sub-Area (15-AFC-01) Filing 09/08/2017, 9:04 AM
Aug 16, 2017 Moorpark Sub-Area Local Capacity Requirement Study - Puente Power Project (15-AFC-01) Study 08/16/2017, 5:00 PM
No results
View previous CEC filings.

Court

Other regulatory agencies

Title Type Posted
Mar 9, 2026 California Air Resources Board - Comments on Proposed Amendments - California Cap on Greenhouse Gas Emissions and Market-Based Compliance Mechanisms Filing, Comment 03/12/2026, 4:18 PM
Feb 9, 2026 California Air Resources Board - Comments regarding Feb 26, 2026 Hearing - Greenhouse Gas Reporting and Climate-Related Financial Risk Disclosure Initial Regulation Filing 02/09/2026, 12:03 PM
Sep 11, 2025 California Air Resources Board - Comments on August 21, 2025 Climate Disclosure Workshop - California Climate-Disclosure Information Solicitation Filing 09/12/2025, 11:02 AM
Jul 30, 2025 Comments on Jun 26, 2025 Cap-and-Invest Electricity Forum: Electricity Imports and Centralized Electricity Markets - WA Department of Ecology (WAC 173-441 and WAC 173-446) Comment 07/31/2025, 2:32 PM
Apr 18, 2025 Comments on the Mar 6, 2025 Cap-and-Invest Electricity Forum - WA Department of Ecology (WAC 173-441 and WAC 173-446) Comment 04/21/2025, 9:00 AM
Mar 21, 2025 California Air Resources Board - Comments on the Implementation of Senate Bills 253 and 261 - California Climate-Disclosure Information Solicitation Filing 03/21/2025, 3:41 PM
Sep 27, 2024 Comments on Linkage Rulemaking - WA Department of Ecology (WAC 173-441 and WAC 173-446) Comment 09/30/2024, 11:31 AM
Aug 20, 2024 Comments on Electricity Markets Rule Proposal Phase - WA Dept of Ecology (173-441 and 173-446 WAC) Filing 08/21/2024, 4:14 PM
Jul 03, 2024 Comments of the ISO/RTO Council on the CISA Notice of Proposed Rulemaking regarding CIRCIA Reporting Requirements (CISA-2022-0010) Filing 07/03/2024, 12:20 PM
Nov 27, 2023 Comments on November 8 workshop - outstanding emissions calculation (173-441 and 173-446 WAC) Comment 11/28/2023, 8:17 AM
Oct 30, 2023 Comments on Draft Regulations (173-441 and 173-446 WAC) Filing 10/31/2023, 10:03 AM
Aug 25, 2023 Supplemental Comments - WA State Dept. of Ecology Rulemaking re Electricity Importers from Centralized Electricity Markets (173-441 and 173-446 WAC) Filing 08/25/2023, 2:20 PM
Aug 16, 2023 CAISO Comments (WA State Dept. of Ecology Rulemaking re Electricity Importers from Centralized Electricity Markets: 173-441 and 173-446 WAC) Comment 08/16/2023, 3:09 PM
Aug 8, 2023 Comments on Environmental Protection Agency Greenhouse Gas Standards and Guidelines (EPA-HQ-OAR-2023-0072) Comment 08/08/2023, 11:03 AM
Jul 31, 2023 Comments on the Department of Energy's Request for Information on the Designation of NIETCs (DOE-HQ-2023-0039) Filing 07/31/2023, 2:49 PM
Jan 2, 2023 Letter to California Energy Commission Vice Chair on CAISO Reliability Modeling 02/02/2023, 10:39 AM
Nov 30, 2022 Joint Letter to California State Water Resources Control Board - Use of the Once-Through Cooling Power Plants in the Strategic Reserve Comment 12/15/2022, 2:35 PM
Sep 7, 2022 Request to Department of Energy for Extension of Sep 2, 2022 Emergency Order (FPA 202c) Filing 09/07/2022, 1:07 PM
Sep 7, 2022 Request to Department of Energy for Modification of Sep 2, 2022 Emergency Order (FPA 202c) Filing 09/07/2022, 1:07 PM
Sep 2, 2022 Department of Energy Order No. 202-22-1 in response to Sep 1, 2022 emergency request Filing 09/02/2022, 2:50 PM
Sep 1, 2022 Request to Department of Energy for Emergency Order - Grid Reliability (FPA 202c) Filing 09/02/2022, 7:44 AM
Jul 15, 2022 CAISO Comments on Washington Cap and Invest Rulemaking (WAC 173-446) Filing 07/15/2022, 4:03 PM
Sep 10, 2021 Department of Energy Order No. 202-21-2 in response to September 7, 2021 emergency request Order 10/26/2021, 2:09 PM
Sep 7, 2021 Request to the Department of Energy for an Emergency Order under Section 202(c) of the Federal Power Act Filing 09/08/2021, 12:04 PM
Jun 7, 2021 ISO-RTO Council Comments on Department of Energy Supply Chain Request for Information (DOE_FRDOC_0001-4185) Comment 06/07/2021, 10:23 AM
Dec 9, 2020 Comments on the Public Utilities Commission of Nevada Investigation - California Heat Storm (20-08014) Comment 12/11/2020, 4:09 PM
Department of Energy - Emergency Order No. 202-20-2 - Sep 6, 2020 Order 09/11/2020, 2:02 PM
Request to Department of Energy for Emergency Order under Section 202(c) of Federal Power Act - Sep 6, 2020 09/11/2020, 2:02 PM
Nov 15, 2019 Comments - Colorado Transmission Coordination Act (19M-0495E) Comment 11/15/2019, 4:00 PM
Nov 5, 2019 Notice of Participation - Colorado Transmission Coordination Act (19M-0495E) Filing 11/06/2019, 3:13 PM
Nov 30, 2018 California Air Resource Board - Comments on Modified Text to Proposed Amendments to the California Cap and Trade and Mandatory Greenhouse Gas Regulations Filing 11/30/2018, 2:14 PM
Oct 22, 2018 California Air Resources Board - Comments on Proposed Amendments - California Cap and Trade and Mandatory Greenhouse Gas Reporting Regulations Filing 10/22/2018, 3:53 PM
Feb 16, 2018 Closing Comments to Public Utilities Commission of Nevada Investigation - Energy Choice Initiative (17-10001) Filing 02/16/2018, 4:07 PM
Jan 3, 2018 Reply Comments to the Public Utilities Commission of Nevada Investigation - Energy Choice Initiative (17-10001) Filing 01/03/2018, 4:27 PM
Dec 8, 2017 Comments to the Public Utilities Commission of Nevada Investigation - Energy Choice Initiative (17-10001) Filing 12/08/2017, 2:21 PM
Nov 21, 2017 Comments New Mexico Public Regulatory Commission Notice of Inquiry - Public Service Company of New Mexico Becoming a Member of Southwest Power Pool (17-00261-UT) Filing 11/21/2017, 4:24 PM
Nov 21, 2017 Motion to Intervene New Mexico Public Regulatory Commission Notice of Inquiry - Public Service Company of New Mexico Becoming a Member of Southwest Power Pool (17-00261-UT) Filing 11/21/2017, 4:24 PM
No results
View all previous regulatory agency filings.