Skip to main content

Filings

Recent Federal Energy Regulatory Commission (FERC) filings

Title Type Posted
Jul 30, 2026 Initial Post-Hearing Brief - DCR Transmission (ER23-2309, ER24-1394, and EL26-34) Filing 07/30/2026, 2:23 PM
Jul 28, 2026 Tariff Amendment - Congestion Revenue Rights Enhancements - Model Loop Flow in CRR Process (ER26-3305) Filing 07/28/2026, 1:35 PM
Jul 27, 2026 June 2026 WEIM Transition Period Report for Power Watch, LLC (ER15-2565) Report, Filing 07/27/2026, 4:47 PM
Jul 27, 2026 June 2026 WEIM Transition Period Report - Black Hills Power, Inc. (ER15-2565) Report, Filing 07/27/2026, 4:47 PM
Jul 20, 2026 Informational Report - Large Loads and Co-Located Loads (EL26-71) Report, Filing 07/20/2026, 2:15 PM
Jul 09, 2026 -CAISO's Answer to Protests - Interconnection Process Enhancements 5 Tariff Amendment (ER26-2747) Filing 07/09/2026, 2:48 PM
Jul 07, 2026 Informational Filing - Jun 2026 Negotiated Default Energy Bids, Opportunity Cost Adders, and Variable Operations Maintenance Adder Informational Report (ER06-615) Report, Filing 07/07/2026, 3:02 PM
Jul 07, 2026 Petition for Limited Waiver regarding EDAM Settlement Dispute Deadlines (ER26-3104) Filing 07/07/2026, 10:11 AM
Jun 22, 2026, Joint Motion for Adoption of Joint Transcript Corrections - DCR Transmission (ER23-2309, ER24-1394, and EL26-34) Motion, Filing 06/29/2026, 4:51 PM
Jun 29, 2026 Reconciliation of Overlapping Tariff Records Related to EDAM/DAME Initiatives (ER26-2986) Filing 06/29/2026, 11:44 AM
Jun 26, 2026 May 2026 WEIM Transition Period Report - Black Hills Power, Inc. (ER15-2565) Report, Filing 06/26/2026, 11:24 AM
Jun 25, 2026 May 2026 WEIM Transition Period Report for Power Watch, LLC (ER15-2565) Report, Filing 06/25/2026, 2:37 PM
Jun 12, 2026 Ironwood Pseudo-Tie Export Agreement Filing between CAISO and APS (ER26-2829) Filing 06/12/2026, 2:38 PM
Jun 11, 2026 Updated Attachment D of Tariff Amendment to Support Startup Funding for the Regional Organization for Western Energy (ER26-2789) Amendment, Filing 06/11/2026, 4:33 PM
Jun 11, 2026 Tariff Amendment - Support Startup Funding for the Regional Organization for Western Energy (ER26-2789) Amendment, Tariff 06/11/2026, 3:22 PM
Jun 8, 2026 Informational Filing - May 2026 Negotiated Default Energy Bids, Opportunity Cost Adders, and Variable Operations and Maintenance Adder Informational Report (ER06-615) Filing 06/08/2026, 2:20 PM
Jun 5, 2026 Tariff Amendment - Interconnection Process Enhancements 5 (ER26-2747) Filing 06/05/2026, 12:17 PM
Jun 2, 2026 Errata to Informational Filing of 2-Year Suspension - SPTO Tariff Amendment (ER25-2442) Filing 06/02/2026, 10:08 AM
May 29, 2026 Joint Motion for Extension of Procedural Schedule, Adoption of Updated Procedural Schedule, and Request for Waiver of Answer Period - DCR Transmission (ER23-2309, ER24-1394, and EL26-34) Filing 05/29/2026, 4:09 PM
May 29, 2026 Informational Filing of 2-Year Suspension - Subscriber Participating Transmission Owner - Tariff Amendment (ER25-2442) Filing 05/29/2026, 10:29 AM
May 22, 2026 Tariff amendment - Cost-of-Service Study Deferral and Cost Cap Update (ER26-2612) Filing 05/22/2026, 11:35 AM
May 21, 2026 Protest to Application of TransAlta Centralia Generation LLC (ER26-2422) Filing 05/21/2026, 2:32 PM
May 21, 2026 Multilateral Variable Energy Resource Agreement between CAISO and SunZia (ER26-2595) Filing 05/21/2026, 12:37 PM
May 20, 2026 Compliance Filing of Effective Date - Resource Adequacy Modeling and Program Design Tariff Amendment (ER26-1593) Filing 05/20/2026, 12:31 PM
May 14, 2026 Further Compliance Filing of Effective Date - Supportive Amendment Filing of EDAM/DAME (ER26-1294) Filing 05/14/2026, 12:20 PM
May 14, 2026 Further Compliance Filing of Effective Date - Congestion Revenue Allocation in EDAM (ER25-2637) Filing 05/14/2026, 12:20 PM
May 7, 2026 Informational Filing - April 2026 Negotiated Default Energy Bids, Opportunity Cost Adders, and Variable Operations and Maintenance Adder Informational Report (ER06-615) Filing 05/07/2026, 11:31 AM
Apr 30, 2026 Notice of Termination - Nodal Pricing Model Agreement between CAISO and PacifiCorp (ER26-2405) Filing 04/30/2026, 1:32 PM
Apr 24, 2026 Informational Filing of Effective Date in Multiple dockets relating to DAME-EDAM (ER23-2686, ER24-379, ER24-1746 & ER25-437) Filing 04/24/2026, 1:04 PM
Apr 24, 2026 Compliance Filing of Effective Date - Tariff Amendment Supporting DAME-EDAM (ER26-1294) Filing 04/24/2026, 1:04 PM
Apr 24, 2026 Compliance Filing of Effective Date - Congestion Revenue Allocation in EDAM (ER25-2637) Filing 04/24/2026, 1:04 PM
Apr 22, 2026 First Congestion Revenue Allocation Informational Report (ER25-2637) Filing 04/22/2026, 12:39 PM
Apr 17, 2026 EDAM Addendum to the Powerex EIM Participating Resource Scheduling Coordinator Agreement (ER26-2248) Filing 04/17/2026, 3:16 PM
Apr 15, 2026 Motion for Leave to Answer and Limited Answer to DCRT (ER23-2309) Filing 04/15/2026, 3:14 PM
Apr 13, 2026 Informational Filing of Effective Date - Transmission Control Agreement regarding Subscriber Participating Transmission Owners - SunZia (ER25-169) Filing 04/13/2026, 3:40 PM
Apr 10, 2026 Request for Interlocutory Appeal and Emergency Request to Suspend Obligation to respond to Data Request (ER23-2309) Filing 04/10/2026, 3:46 PM
Apr 7, 2026 Certificate of Concurrence - Unexecuted Large Generator Interconnection Agreement between CAISO, SCE, and RTSW (ER26-2060) Filing 04/08/2026, 12:15 PM
Apr 7, 2026 Informational Filing - March 2026 Negotiated Default Energy Bids, Opportunity Cost Adders, and Variable Operations and Maintenance Adder Informational Report (ER06-615) Report, Filing 04/08/2026, 9:33 AM
Apr 7, 2026 Certificate of Concurrence - Unexecuted Large Generator Interconnection Agreement btween CAISO, SCE & RTSW Solar Park (ER26-2060) 04/07/2026, 1:42 PM
Apr 3, 2026 Supplemental Answer to Motion to Compel of DCR Transmission (ER23-2309, et. al.) Filing 04/03/2026, 3:04 PM
Apr 3, 2026 WEIM Readiness Certification for Power Watch (ER15-861) 04/03/2026, 12:42 PM
Apr 3, 2026 WEIM Readiness Certification for Black Hills (ER15-861) 04/03/2026, 12:42 PM
Apr 2, 2026 CAISO Answer to Motion to Compel of DCR Transmission (ER23-2309, et. al.) Filing 04/03/2026, 9:08 AM
Mar 18, 2026 Certificate of Concurrence - Upgraded Facilities Agreement between CAISO, SCE and Olympus (ER26-1860) Filing 03/18/2026, 1:37 PM
Mar 9, 2026 Motion for Leave to File Answer and Answer to Comments - EDAM/DAME Supportive Tariff Revisions (ER26-1294) Motion, Filing 03/09/2026, 2:06 PM
Mar 9, 2026 Informational Filing - February 2026 Negotiated Default Energy Bids, Opportunity Cost Adders, and Variable Operations and Maintenance Adder Informational Report (ER06-615) Filing 03/09/2026, 2:06 PM
Mar 3, 2026 Tariff Amendment - Resource Adequacy Modeling and Program Design Initiative - Track 1 and 3A (ER26-1593) Filing 03/03/2026, 1:11 PM
Mar 2, 2026 Request for Rehearing - DCR Transmission (ER23-2309, ER24-1394, and EL26-34) Filing 03/03/2026, 10:22 AM
Feb 27, 2026 Notice of Cancellation - EIM Implementation Agreement between CAISO and WAPA (ER26-1554) Filing 02/27/2026, 4:42 PM
Feb 27, 2026 Notice of Cancellation - EIM Implementation Agreement between CAISO and Turlock (ER26-1553) Filing 02/27/2026, 4:42 PM
No results
View previous FERC filings.

Recent California Public Utilities Commission (CPUC) filings

Title Type Posted
Jul 27, 2026 Comments on Ruling Issuing Questions on the Distributed Energy Resources Orchestration Workshop Reports - High Distributed Energy Resources (R.21-06-017) Filing, Comment 07/27/2026, 4:45 PM
Jul 24, 2026 Reply Brief - Collinsville 500/230 kV Substation Project (A.24-07-018) Filing 07/24/2026, 4:25 PM
Jul 10, 2026 Opening Brief - Collinsville 500/230 kV Substation Project (A.24-07-018) Filing 07/10/2026, 4:57 PM
Jun 30, 2026 Second Notice of Ex Parte Meeting - Resource Adequacy Program (R.25-10-003) Notice, Filing 07/01/2026, 12:18 PM
Jun 30, 2026 First Notice of Ex Parte Meeting - Resource Adequacy Program (R.25-10-003) Notice, Filing 07/01/2026, 12:18 PM
Jun 30, 2026 Motion to Move Existing Testimony into Formal Record of Proceeding - Collinsville 500/230 kV Substation Project (A.24-07-018) Motion, Filing 07/01/2026, 12:18 PM
Jun 29, 2026, Sur-Surrebuttal Testimony of Binaya Shrestha - Collinsville 500/230 kV Substation Project (A.24-07-018) Testimony, Filing 06/29/2026, 4:51 PM
Jun 29, 2026, Reply Comments on the Proposed Decision Adopting Local Capacity Obligations for 2027-2029, Flexible Capacity Obligations for 2027, and Program Refinement - Resource Adequacy Program (R.25-10-003) Filing, Comment 06/29/2026, 4:51 PM
Jun 29, 2026 Notice of Ex Parte Meeting - Resource Adequacy Program (R.25-10-003) Notice, Filing 06/29/2026, 4:51 PM
Jun 22, 2026, Three-Day Notice of Ex Parte Meeting - Resource Adequacy Programs (R.25-10-003) Filing 06/22/2026, 5:03 PM
Jun 22, 2026 Opening Comments on the Proposed Decision Adopting Local Capacity Obligations for 2027-2029, Flexible Capacity Obligations for 2027, and Program Refinement - Resource Adequacy Program (R.25-10-003) Filing, Comment 06/22/2026, 4:42 PM
Jun 19, 2026 Three-Day Notice of Ex Parte Meeting - Resource Adequacy Program (R.25-10-003) 06/19/2026, 1:13 PM
Jun 16, 2026 Joint Motion of LS Power LLC, California Forever LP, and the California ISO to Amend the Scoping Memo and Ruling - Collinsville 500/230kV Substation Project (A.24-07-018) Filing 06/17/2026, 4:46 PM
Jun 05, 2026, Testimony of Binaya Shrestha - Collinsville 500/230 kV Substation Project (A.24-07-018) Testimony 06/05/2026, 3:52 PM
May 13, 2026 Final 2027 Flexible Capacity Needs Assessment and Final 2027 Availability Assessment Hours - Resource Adequacy Program (R.25-10-003) Report, Filing 05/13/2026, 11:59 AM
May 1, 2026 Final 2027 Local Capacity Technical Report and Update Regarding 2027 Flexible Capacity Needs Assessment - Resource Adequacy Program (R.25-10-003) Report, Filing 05/01/2026, 3:56 PM
Apr 20, 2026 Comments on Ruling on Track 1 and Track 2 Distributed Energy Resources Orchestration - High Distributed Energy Resources (R.21-06-017) Filing, Comment 04/21/2026, 5:15 PM
Apr 3, 2026 Draft 2027 Local Capacity Technical Report - Resource Adequacy Program (R.25-10-003) Report, Filing 04/03/2026, 11:37 AM
Mar 31, 2026 Motion to Adjust the Track 1 Schedule for Local Capacity Technical Analysis and Flexible Capacity Needs Assessment for 2027 - Resource Adequacy Program (R.25-10-003) Motion, Filing 03/31/2026, 4:51 PM
Mar 20, 2026 Reply Comments on Track 1 Proposals - Resource Adequacy Program (R.25-10-003) Filing, Comment 03/20/2026, 4:32 PM
Mar 6, 2026 Opening Comments on Track 1 Proposals - Resource Adequacy Program (R.25-10-003) Filing, Comment 03/09/2026, 8:50 AM
Feb 26, 2026 Motion for Party Status - Collinsville 500/230 kV Substation Project (A.24-07-018) Filing 02/26/2026, 12:40 PM
Feb 11, 2026 Reply Comments on Proposed Decision Requiring 2029-2032 Electric Resource Procurement and Transmitting Portfolios for 2026-2027 Transmission Planning Process - Integrated Resource Planning (R.25-06-019) Filing 02/11/2026, 4:35 PM
Feb 6, 2026 Opening Comments on Proposed Decision Requiring 2029-2032 Electric Resource Procurement and Transmitting Portfolios for 2026-2027 Transmission Planning Process - Integrated Resource Planning (R.25-06-019) Filing, Comment 02/06/2026, 4:21 PM
Jan 23, 2026 Track 1 Proposals - Resource Adequacy Program (R.25-10-003) Filing 01/23/2026, 3:54 PM
Nov 26, 2025 Motion for Party Status - Ironwood Transmission Line Project (A.25-09-008) 11/26/2025, 9:56 AM
Nov 13, 2025 Opening Comments on Order Instituting Rulemaking - Demand Response (R.25-09-004) Filing, Comment 11/14/2025, 9:31 AM
Nov 10, 2025 Opening Testimony of Binaya Shrestha - Northern San Joaquin 230 kV Transmission Project (A.23-09-001) Testimony, Filing 11/10/2025, 3:36 PM
Nov 4, 2025 Comments on Order Instituting Rulemaking - Resource Adequacy Program (R.25-10-003) Filing, Comment 11/05/2025, 10:39 AM
Oct 31, 2025 Reply Comments on ALJ Ruling Seeking Comments on Electricity Portfolios for 2026-2027 Transmission Planning Process and Need for Additional Reliability Procurement - Integrated Resource Planning (R.25-06-019) Filing, Comment 11/03/2025, 11:54 AM
Oct 24, 2025 Testimony of Jeff Billinton - Power Santa Clara Valley Project (A. 24-04-017) Testimony, Filing 10/27/2025, 8:55 AM
Oct 22, 2025 Opening Comments on ALJ Ruling Seeking Comments on Electricity Portfolios for 2026-2027 Transmission Planning Process and need for Additional Reliability Procurement - Integrated Resource Planning (R.25-06-019) Filing, Comment 10/23/2025, 9:54 AM
Sep 17, 2025 Motion for Party Status - Integrated Resource Planning (R.25-06-019) Motion, Filing 09/18/2025, 9:53 AM
Aug 5, 2025 Reply Comments on ALJ Ruling Seeking Comments on Reliable and Clean Power Procurement Program Staff Proposal - Integrated Resource Planning (R.20-05-003) Filing, Comment 08/06/2025, 10:26 AM
Jul 15, 2025 Opening Comments - Reliable and Clean Power Procurement Program Proposal (R.20-05-003) Filing 07/15/2025, 4:41 PM
Jul 14, 2025 Motion for Party Status in the Application of Pacific Gas and Electric for a Certificate of Public Convenience and Necessity - Northern San Joaquin 230 kV Transmission Project (A.23-09-001) Filing 07/15/2025, 3:19 PM
Jun 16, 2025 Reply Comments on the Proposed Decision Adopting Local Capacity Obligations for 2026-2028, Flexible Capacity Obligations for 2026, and Program Refinement - Resource Adequacy Program (R.23-10-011) Filing, Comment 06/17/2025, 11:14 AM
Jun 11, 2025 Opening Comments on the Proposed Decision Adopting Local Capacity Obligations for 2026-2028, Flexible Capacity Obligations for 2026, and Program Refinement - Resource Adequacy Program (R.23-10-011) Filing, Comment 06/12/2025, 9:42 AM
May 16, 2025 Notice of Availability of Final 2026 Flexible Capacity Needs Assessment and Availability Assessment Hours - Resource Adequacy Program (R.23-10-011) Report, Filing 05/16/2025, 3:02 PM
May 15, 2025 Notice of Ex Parte Meeting - Resource Adequacy Program (R.23-10-011) Filing 05/15/2025, 10:40 AM
May 7, 2025 Notice of Ex Parte Meeting - Resource Adequacy Program (R.23-10-011) Filing 05/07/2025, 2:36 PM
May 1, 2025 Notice of Availability of Final 2026 Local Capacity Technical Report and Update Regarding 2026 Flexible Capacity Needs Assessment - Resource Adequacy Program (R.23-10-011) Report, Filing 05/01/2025, 11:00 AM
Apr 17, 2025 Motion for Party Status - Manning 500/230 kV Substation Project (A.24-06-017) Motion, Filing 04/17/2025, 3:48 PM
Apr 3, 2025 Draft 2026 Local Capacity Technical Report - Resource Adequacy Program (R.23-10-011) Report, Filing 04/03/2025, 12:03 PM
Mar 25, 2025 CAISO Response Request for Rehearing - General Order 131-D (R.23-05-018) Filing 03/26/2025, 9:22 AM
Mar 17, 2025 Reply Comments on Track 3 Proposals - Resource Adequacy Program (R.23-10-011) 03/18/2025, 12:37 PM
Mar 3, 2025 Opening Comments on Track 3 Proposals - Resource Adequacy Program (R.23-10-011) Filing, Comment 03/04/2025, 8:23 AM
Feb 4, 2025 Reply Comments on the Proposed Decision Transmitting Electricity Resource Portfolios to the CAISO for 2025-2026 Transmission Planning Process - Integrated Resource Planning (R.20-05-003) Filing, Comment 02/05/2025, 12:27 PM
Jan 30, 2025 Opening Comments on the Proposed Decision Transmitting Electricity Resource Portfolios to the CAISO for 2025-2026 Transmission Planning Process - Integrated Resource Planning (R.20-05-003) Filing, Comment 01/31/2025, 9:11 AM
Jan 16, 2025 Opening Comments on Proposed Decision Adopting General Order 131-E - General Order 131-D (R.23-05-018) Filing, Comment 01/17/2025, 10:44 AM
No results
View previous CPUC filings.

Recent California Energy Commission (CEC) filings

Title Type Posted
Mar 16, 2026 Comments on Revised Draft Demand Side Grid Support Program Guidelines, Fifth Edition - Reliability Reserve Incentive Programs (22-RENEW-01) Filing, Comment 03/16/2026, 4:02 PM
Feb 7, 2025 Comments on the Integrated Energy Policy Report Commissioner Workshop on Regional Electricity Markets and Coordination (24-IEPR-01) Filing, Comment 02/10/2025, 9:03 AM
Jan 2, 2025 Comments on the Integrated Energy Policy Report Commissioner Workshop on Draft Forecast Results (24-IEPR-03) Filing, Comment 01/03/2025, 9:22 AM
Nov 30, 2023 Comments on Assembly Bill 209 Publicly Owned Utility Planning Reserve Margin Workshop (21-ESR-01) Filing 12/01/2023, 8:27 AM
Dec 20, 2022 Comments on Qualifying Capacity of Supply Side Demand Response Working Group Draft Report (21-DR-01) Filing 12/21/2022, 8:50 AM
Oct 17, 2022 Comments on Supply-Side Demand Response Working Group Proposals (21-DR-01) Filing 10/19/2022, 8:45 AM
Feb 4, 2022 Comments on Supply-Side Demand Response Working Group Report (21-DR-01) Filing 02/07/2022, 11:00 AM
Dec 17, 2021 Comments on Supply-Side Demand Response Workshop (21-IEPR-04) Filing 12/17/2021, 1:44 PM
Aug 2, 2021 Comments on Supply-Side Demand Response Stakeholder Working Group Process (21-DR-01) Filing 08/03/2021, 3:14 PM
Jul 2, 2021 California ISO Comments - Russell City (01-AFC-7C) Filing 07/02/2021, 2:13 PM
Mar 9, 2020 Comments on Modeling Inputs and Assumptions Workshop - SB-100 Path to Clean Energy Future (19-SB-100) Filing, Comment 03/10/2020, 3:28 PM
Jan 24, 2020 Comments on Draft Scoping Memo - Load Management Rulemaking (19-OIR-01) Comment 01/24/2020, 2:57 PM
Dec 13, 2019 Weather Normalized 2019 Peak Demands and Peak Demands Forecasts for 2020 (19-IEPR-03) Filing 12/16/2019, 8:07 AM
Nov 1, 2019 Briefing on Post-2020 Grid Operational Outlook (19-IEPR-01) Filing 11/01/2019, 1:09 PM
Jan 25, 2019 Comments on the Southern California Natural Gas Prices Joint Workshop - 2018 Integrated Energy Policy Report (18-IEPR-03) Filing 01/30/2019, 2:15 PM
Sep 29, 2017 Comments re Moorpark Sub-Area Local Capacity Alternative Study - Puente Power Project (15-AFC-01) Filing 09/29/2017, 4:11 PM
Sep 7, 2017 Prehearing Conference Statement - Puente Power Project for Moorpark Sub-Area (15-AFC-01) Filing 09/08/2017, 9:04 AM
Aug 16, 2017 Moorpark Sub-Area Local Capacity Requirement Study - Puente Power Project (15-AFC-01) Study 08/16/2017, 5:00 PM
No results
View previous CEC filings.

Court

Other regulatory agencies

Title Type Posted
May 4, 2026 California Air Resources Board - Comments on Modifications to Proposed Amendments - California Cap on Greenhouse Gas Emissions and Market-Based Compliance Mechanisms Filing, Comment 05/04/2026, 4:50 PM
Apr 22, 2026 U.S. Energy Information Administration - Joint ISO/RTO Comments on EIA-930A Filing, Comment 04/22/2026, 5:23 PM
Mar 9, 2026 California Air Resources Board - Comments on Proposed Amendments - California Cap on Greenhouse Gas Emissions and Market-Based Compliance Mechanisms Filing, Comment 03/12/2026, 4:18 PM
Feb 9, 2026 California Air Resources Board - Comments regarding Feb 26, 2026 Hearing - Greenhouse Gas Reporting and Climate-Related Financial Risk Disclosure Initial Regulation Filing 02/09/2026, 12:03 PM
Sep 11, 2025 California Air Resources Board - Comments on August 21, 2025 Climate Disclosure Workshop - California Climate-Disclosure Information Solicitation Filing 09/12/2025, 11:02 AM
Jul 30, 2025 Comments on Jun 26, 2025 Cap-and-Invest Electricity Forum: Electricity Imports and Centralized Electricity Markets - WA Department of Ecology (WAC 173-441 and WAC 173-446) Comment 07/31/2025, 2:32 PM
Apr 18, 2025 Comments on the Mar 6, 2025 Cap-and-Invest Electricity Forum - WA Department of Ecology (WAC 173-441 and WAC 173-446) Comment 04/21/2025, 9:00 AM
Mar 21, 2025 California Air Resources Board - Comments on the Implementation of Senate Bills 253 and 261 - California Climate-Disclosure Information Solicitation Filing 03/21/2025, 3:41 PM
Sep 27, 2024 Comments on Linkage Rulemaking - WA Department of Ecology (WAC 173-441 and WAC 173-446) Comment 09/30/2024, 11:31 AM
Aug 20, 2024 Comments on Electricity Markets Rule Proposal Phase - WA Dept of Ecology (173-441 and 173-446 WAC) Filing 08/21/2024, 4:14 PM
Jul 03, 2024 Comments of the ISO/RTO Council on the CISA Notice of Proposed Rulemaking regarding CIRCIA Reporting Requirements (CISA-2022-0010) Filing 07/03/2024, 12:20 PM
Nov 27, 2023 Comments on November 8 workshop - outstanding emissions calculation (173-441 and 173-446 WAC) Comment 11/28/2023, 8:17 AM
Oct 30, 2023 Comments on Draft Regulations (173-441 and 173-446 WAC) Filing 10/31/2023, 10:03 AM
Aug 25, 2023 Supplemental Comments - WA State Dept. of Ecology Rulemaking re Electricity Importers from Centralized Electricity Markets (173-441 and 173-446 WAC) Filing 08/25/2023, 2:20 PM
Aug 16, 2023 CAISO Comments (WA State Dept. of Ecology Rulemaking re Electricity Importers from Centralized Electricity Markets: 173-441 and 173-446 WAC) Comment 08/16/2023, 3:09 PM
Aug 8, 2023 Comments on Environmental Protection Agency Greenhouse Gas Standards and Guidelines (EPA-HQ-OAR-2023-0072) Comment 08/08/2023, 11:03 AM
Jul 31, 2023 Comments on the Department of Energy's Request for Information on the Designation of NIETCs (DOE-HQ-2023-0039) Filing 07/31/2023, 2:49 PM
Jan 2, 2023 Letter to California Energy Commission Vice Chair on CAISO Reliability Modeling 02/02/2023, 10:39 AM
Nov 30, 2022 Joint Letter to California State Water Resources Control Board - Use of the Once-Through Cooling Power Plants in the Strategic Reserve Comment 12/15/2022, 2:35 PM
Sep 7, 2022 Request to Department of Energy for Extension of Sep 2, 2022 Emergency Order (FPA 202c) Filing 09/07/2022, 1:07 PM
Sep 7, 2022 Request to Department of Energy for Modification of Sep 2, 2022 Emergency Order (FPA 202c) Filing 09/07/2022, 1:07 PM
Sep 2, 2022 Department of Energy Order No. 202-22-1 in response to Sep 1, 2022 emergency request Filing 09/02/2022, 2:50 PM
Sep 1, 2022 Request to Department of Energy for Emergency Order - Grid Reliability (FPA 202c) Filing 09/02/2022, 7:44 AM
Jul 15, 2022 CAISO Comments on Washington Cap and Invest Rulemaking (WAC 173-446) Filing 07/15/2022, 4:03 PM
Sep 10, 2021 Department of Energy Order No. 202-21-2 in response to September 7, 2021 emergency request Order 10/26/2021, 2:09 PM
Sep 7, 2021 Request to the Department of Energy for an Emergency Order under Section 202(c) of the Federal Power Act Filing 09/08/2021, 12:04 PM
Jun 7, 2021 ISO-RTO Council Comments on Department of Energy Supply Chain Request for Information (DOE_FRDOC_0001-4185) Comment 06/07/2021, 10:23 AM
Dec 9, 2020 Comments on the Public Utilities Commission of Nevada Investigation - California Heat Storm (20-08014) Comment 12/11/2020, 4:09 PM
Request to Department of Energy for Emergency Order under Section 202(c) of Federal Power Act - Sep 6, 2020 09/11/2020, 2:02 PM
Department of Energy - Emergency Order No. 202-20-2 - Sep 6, 2020 Order 09/11/2020, 2:02 PM
Nov 15, 2019 Comments - Colorado Transmission Coordination Act (19M-0495E) Comment 11/15/2019, 4:00 PM
Nov 5, 2019 Notice of Participation - Colorado Transmission Coordination Act (19M-0495E) Filing 11/06/2019, 3:13 PM
Nov 30, 2018 California Air Resource Board - Comments on Modified Text to Proposed Amendments to the California Cap and Trade and Mandatory Greenhouse Gas Regulations Filing 11/30/2018, 2:14 PM
Oct 22, 2018 California Air Resources Board - Comments on Proposed Amendments - California Cap and Trade and Mandatory Greenhouse Gas Reporting Regulations Filing 10/22/2018, 3:53 PM
Feb 16, 2018 Closing Comments to Public Utilities Commission of Nevada Investigation - Energy Choice Initiative (17-10001) Filing 02/16/2018, 4:07 PM
Jan 3, 2018 Reply Comments to the Public Utilities Commission of Nevada Investigation - Energy Choice Initiative (17-10001) Filing 01/03/2018, 4:27 PM
Dec 8, 2017 Comments to the Public Utilities Commission of Nevada Investigation - Energy Choice Initiative (17-10001) Filing 12/08/2017, 2:21 PM
Nov 21, 2017 Motion to Intervene New Mexico Public Regulatory Commission Notice of Inquiry - Public Service Company of New Mexico Becoming a Member of Southwest Power Pool (17-00261-UT) Filing 11/21/2017, 4:24 PM
Nov 21, 2017 Comments New Mexico Public Regulatory Commission Notice of Inquiry - Public Service Company of New Mexico Becoming a Member of Southwest Power Pool (17-00261-UT) Filing 11/21/2017, 4:24 PM
No results
View all previous regulatory agency filings.
Back to top