Skip to main content
Library

Interconnection requirements review

To maintain system reliability on an ongoing basis, changes are required to the ISO interconnection requirements to accommodate increasing amounts of variable generation. This initiative proposes modifications to the operating power factor, voltage control, disturbance ride through, and generation management parameters for asynchronous generators, such as wind and solar resources. These requirements will be incorporated in interconnection agreements, if approved by the Federal Energy Regulatory Commission (FERC), and will make the technical requirements for these variable generation technologies more consistent with those of conventional generators.

34 documents

34 of 34 results
Title Type Posted
SunPower Coments on IRRP Draft Tariff Language 3-Jun-2010 76.60 KB 06/04/2010, 2:30 PM
LSA and CalWEA Comments on IRRP Draft Tariff Language 3-Jun-2010 45.82 KB Comment 06/04/2010, 2:26 PM
LS Power Comments on IRRP Draft Tariff Language 03-Jun-2010 22.88 KB Comment 06/04/2010, 2:20 PM
SCE Comments on the IRRP Draft Tariff Language 3-Jun-2010 12.08 KB Comment 06/04/2010, 2:15 PM
Comments of NextEra Energy Resource on the Draft Tariff Language 3-Jun-2010 58.58 KB Comment 06/03/2010, 4:06 PM
Proposed Changes to Appendix Z of California ISO Tariff May 26, 2010 59.35 KB 05/26/2010, 11:12 AM
Draft Tariff Language - Integration of Renewable Resources Program May 25, 2010 78.87 KB Tariff 05/25/2010, 12:17 PM
Matrix of Stakeholder Comments and ISO response 107.00 KB Response 05/14/2010, 4:46 PM
Second Revised Draft Final Straw Proposal - Interim Interconnection Requirements for Large Generator Facilities Review May 07, 2010 123.14 KB Proposal 05/07/2010, 8:51 AM
Sempra Generation Final Comments on Interconnection Requirements Review Straw Proposal 52.58 KB Comment 05/04/2010, 12:06 PM
LS Power Final Comments on Interconnection Requirements Review Straw Proposal 18.07 KB Comment 05/04/2010, 12:04 PM
SCE Final Comments on Interconnection Requirements Review Draft Straw Proposal 74.37 KB Comment 05/04/2010, 12:02 PM
IEP Final Comments on Interconnection Requirements Review Straw Proposal 365.94 KB Comment 05/04/2010, 12:01 PM
LSA Final Comments on IEP Final Comments on Interconnection Requirements Review Straw Proposal 211.53 KB Comment 05/04/2010, 11:58 AM
IEP Comments on Interconnection Requirements Review Draft Straw Proposal 468.05 KB Comment 04/26/2010, 3:58 PM
LSA Comments on Interconnection Requirements Review Draft Straw Proposal 214.35 KB Comment 04/26/2010, 3:57 PM
NRG Comments on Interconnection Requirements Review Draft Straw Proposal 30.39 KB Comment 04/26/2010, 3:56 PM
NextEra Comments on Interconnection Requirements Review Draft Straw Proposal 66.84 KB Comment 04/26/2010, 3:56 PM
Calpine Comments on Interconnection Requirements Review Draft Straw Proposal 72.85 KB Comment 04/26/2010, 3:55 PM
SCE Comments on Interconnection Requirements Review Draft Straw Proposal 76.00 KB Comment 04/26/2010, 3:54 PM
CPUC DRA Comments on Interconnection Requirements Review Draft Straw Proposal 148.30 KB Comment 04/26/2010, 3:53 PM
Sempra Gen Comments on Interconnection Requirements Review Draft Straw Proposal 324.95 KB Comment 04/26/2010, 3:52 PM
Revised Draft Final Straw Proposal - Interim Interconnection Requirements for Large Generator Facilities Review Apr 26, 2010 122.99 KB Proposal 04/26/2010, 12:05 PM
Interconnection Standards Review for Renewables - Draft Final Straw Proposal 20-Apr-2010 191.35 KB Proposal 04/20/2010, 8:09 PM
Interconnection Standards Review for Renewables - Draft Final Straw Proposal Apr 20, 2010 (Redline) 149.96 KB Proposal 04/20/2010, 1:11 PM
April 12, 2010 Comments of the ISO/RTO Council to notice of inquiry in RM10-11 (Integration of variable energy resources) 1.76 MB Comment 04/13/2010, 1:55 PM
April 12, 2010 Comments on notice of inquiry in docket no. RM10-11-000 (Integration of variable energy resources) 390.58 KB Comment 04/13/2010, 12:16 PM
CalWEA Comments on Interconnection Requirements Review Meeting Presentation 19-Feb-2010 58.95 KB Presentation 04/12/2010, 3:21 PM
Draft Straw Proposal - Interconnection Standards 245.61 KB Proposal 03/25/2010, 9:22 PM
IEP Comments on Interconnection Requirements Review Meeting Presentation 19-Feb-2010 411.90 KB Presentation 03/03/2010, 8:41 AM
Joint Comments by CalWEA, LSA, Solar Millennium on Interconnection Requirements Review Meeting Presentation 19-Feb-2010 170.05 KB Presentation 03/03/2010, 8:40 AM
Calpine Comments on Interconnection Requirements Review Meeting Presentation 19-Feb-2010 77.77 KB Presentation 03/03/2010, 8:38 AM
SCE Comments on Interconnection Requirements Review Meeting Presentation 19-Feb-2010 75.95 KB Presentation 03/03/2010, 8:37 AM
Interconnection Standards Review for Renewables Presentation 282.60 KB Presentation 02/17/2010, 4:46 PM
No results
Back to top