REQUESTED ACTION
Request for commentCATEGORIES
Legal and regulatoryBPM change management: Proposed revision requests and updated BPMs posted 3/4/2025
The California ISO has posted new Proposed Revision Requests (PRRs) reflecting edits to Business Practice Manuals (BPMs). Revised BPMs that have completed the BPM change management process are posted in the BPM Library. All PRRs and related activity are publicly available through the BPM change management site.
BPM PRR updates are part of the ISO's Daily Briefing in addition to being listed in the “Announcement” sections of the BPM change management tool. These updates include PRRs that have become available for review, upcoming BPM meetings, and comment due dates. All registered BPM users should continue to reference the BPM Change Management tool to see current PRR status. Subscribe to the Daily Briefing to stay up to date.
The PRRs listed below have an open 10-business day comment or appeal period from March 4, 2025 through March 18, 2025.
New PRRs
PRR 1617 Not Used
PRR 1618 Market Instruments BPM, Emergency PRR, Clarifications to the after-market cost recovery process.
PRR 1619 Congestion Revenue Rights BPM, Changes related to implementation of the congestion revenue rights replacement project
ISO Recommendations
PRR 1614 Demand Response BPM, Emergency PRR, Demand response related changes due to the penalty enhancements: demand response, investigation, tolling
PRR 1615 Scheduling Coordinator Certification and Termination BPM, Emergency PRR, Updating application to include information for the extended day ahead market
PRR 1616 Reliability Requirements BPM, Capacity procurement mechanism track 1
ISO Final Decisions
PRR 1602 Reliability Requirements BPM, Clarification on outage reporting scenarios for non-resource-specific resource adequacy resources
PRR 1603 Scheduling Coordinator Certification and Termination BPM, Updates to training requirements during scheduling coordinator certification process
PRR 1604 Candidate CRR Holder Registration BPM, Updates to training requirements during congestion revenue rights holder registration process
PRR 1605 Generator Management BPM, Interconnection process enhancements 2023 updates and clarifications
PRR 1606 Settlements and Billing BPM, Emergency PRR, Updating start-up costs minimum load costs pre-calc BPM configuration for minimum load costs qualification from advisory shut
PRR 1607 Withdrawn
PRR 1608 Settlements and Billing BPM, Emergency PRR, Updating resource adequacy availability incentive mechanism pre-calc configuration to fix limited energy storage resources negative generic availability issue
PRR 1609 Market Instruments BPM, Convergence bidding is not permitted on Intertie nodes
PRR 1610 Market Operations BPM, Stage 2 variable energy resource will be set to self-schedule only until the resource is a Stage 3 variable energy resource
PRR 1611 Market Operations BPM, Convergence bidding is not permitted on Intertie nodes
PRR 1612 Market Operations BPM, Stage 2 variable energy resource and aggregate capability constraints limits
PRR 16113 Market Operations BPM, Market issue that resources providing regulation were going off automatic generation control early to ramp to new dispatch operating target
BPM Library Updates
The PRR tracking log on the ISO website lists the updated BPMs in the library.
The ISO may unilaterally make and implement revisions to the BPMs in emergency circumstances, as set forth in Sections 22.4.3 and 22.11 of the ISO Tariff and in Section 2.6 of the Business Practice Manual for BPM Change Management. An emergency PRR will continue through the BPM change management stakeholder process to obtain stakeholder input on the revisions and make other recommendations, as necessary.
Please note that affected parties must register in order to submit a PRR or written comments.
More information on the BPM change management process is available on the BPM webpage of the ISO website.
Meeting information
Contact information
Please contact Nicole Hines at 916-597-8108 or BPM_CM@caiso.com with any questions.