Skip to main content
Library

Reliability Coordinator procedures

42 documents

42 of 42 results
Title Type Posted
RC West Operating Procedures Index List 45.70 KB Procedure 10/14/2026, 4:10 PM
RC0130 Notification Requirements for Real-Time Events 290.79 KB Procedure 10/14/2026, 4:10 PM
RC0710 Frequency and Voltage Ride-Through Requirements and Unexpected Event Mitigation for Inverter-Based Resources: NERC PRC-029 and PRC-030 195.48 KB Procedure 09/30/2026, 10:53 AM
RC0320 Outage Review and Coordination 421.03 KB Procedure 09/30/2026, 10:53 AM
RC0120C ICCP or PMU Data Request Procedure 187.61 KB Procedure 09/30/2026, 10:53 AM
RC0120B RC West IRO-010 Data Specification for Adjacent RCs 59.88 KB Procedure 09/30/2026, 10:53 AM
RC0120A RC West IRO-010 Data Specification 72.62 KB Procedure 09/30/2026, 10:53 AM
RC0540A RC West WIT Schedule Change Process 559.34 KB Procedure 09/16/2026, 11:27 AM
RC0100 Reliability Coordinator Authority 152.68 KB Procedure 09/02/2026, 5:09 PM
RC0420 Event Reporting 318.57 KB Procedure 08/06/2026, 9:24 AM
RC0610 System Operating Limits Methodology for the Operations Horizon 813.00 KB Procedure 07/31/2026, 9:59 AM
RC0460F EOP-005 Plan Review Checklist 63.61 KB Procedure 07/31/2026, 9:59 AM
RC0110 Communications Protocols 207.00 KB Procedure 07/23/2026, 9:16 AM
RC0460 Reliability Coordinator Area Restoration Plan 384.99 KB Procedure 07/08/2026, 5:50 PM
RC0310 Mitigating SOL and IROL Exceedances 424.87 KB Procedure 07/08/2026, 5:50 PM
RC0410 System Emergencies 313.84 KB Procedure 07/01/2026, 10:40 AM
RC0210 Monitoring Frequency and Balancing Authority Performance 325.34 KB Procedure 07/01/2026, 10:40 AM
RC0120 Guidelines for RC West IRO-010 Data Specification and Collection 439.34 KB Procedure 07/01/2026, 10:39 AM
RC0410A EOP-011 Plan Review Checklist 64.73 KB Procedure 05/28/2026, 8:49 AM
RC0330 Coordination with Neighboring Reliability Coordinators 268.46 KB Procedure 05/28/2026, 8:49 AM
RC0140 Guidelines for Sending Messages Across RC Seams 215.54 KB Procedure 05/28/2026, 8:49 AM
RC West Coordination Plan (Reliability Plan) 562.72 KB Procedure 05/07/2026, 10:08 AM
RC0670 NERC PRC-002 Disturbance Monitoring and Reporting Requirements Process 203.56 KB Procedure 01/29/2026, 9:35 AM
RC0430 GMD Operating Plan 494.98 KB Procedure 01/29/2026, 9:35 AM
RC0600A Western Interconnection Modeling and Monitoring Common Methodology 358.11 KB Procedure 12/18/2025, 9:15 AM
RC0600 RC West Implementation of Common Interconnection-wide Methodology 220.18 KB Procedure 12/18/2025, 9:15 AM
RC0540 WIT Administration 368.19 KB Procedure 12/18/2025, 9:15 AM
RC0220 Time Error Correction 185.03 KB Procedure 12/04/2025, 9:38 AM
RC0650 Steady-State and Dynamic System Model Validation: NERC MOD-033 165.38 KB Procedure 11/13/2025, 9:20 AM
RC0610A Criteria for Determining Facilities Critical to Derivation of IROL 167.68 KB Procedure 10/01/2025, 10:11 AM
RC0660 Transmission Relay Loadability: NERC PRC-023 192.35 KB Procedure 07/10/2025, 9:47 AM
RC0640 Transmission Near-Term Planning Assessments: NERC-IRO-017 170.95 KB Procedure 07/10/2025, 9:47 AM
RC0430A EOP-010 Plan Review Checklist 58.80 KB Procedure 06/26/2025, 10:49 AM
RC0680 RC Guidelines for Seasonal Assessment and Coordination Process 341.53 KB Procedure 05/29/2025, 9:34 AM
RC0130B New Equipment/RAS Energization Checklist 216.23 KB Procedure 05/29/2025, 9:34 AM
RC0550 Reliability Coordinator Procedure Development, Maintenance and Distribution 254.78 KB Procedure 03/27/2025, 8:14 AM
RC0690A PRC-012 Remedial Action Schemes - RAS Review Checklist 148.80 KB Procedure 01/18/2024, 11:07 AM
RC0690C PRC-012 Remedial Action Schemes - Corrective Action Plan (CAP) and Results 62.94 KB Procedure 01/18/2024, 11:07 AM
RC0630 Outage Coordination Process 1.02 MB Procedure 01/18/2024, 11:07 AM
RC0690 PRC-012 Remedial Action Schemes 679.84 KB Procedure 01/18/2024, 11:07 AM
RC0690B PRC-012 Process - RAS Design Review 794.17 KB Procedure 01/18/2024, 11:07 AM
RC0620 Operations Planning Analysis (Next Day) 488.01 KB Procedure 12/13/2023, 8:14 AM
No results
Back to top