Demand Response Registration System (DRRS)
The Demand Response Registration System (DRRS) provides participants with the ability to register with the ISO and provide load curtailment in response to Proxy Demand Response (PDR) and Reliability Demand Response (RDR) dispatch instructions.
The DRRS contains the location and registration management for PDR and RDR resources.
Access the application through the MPP*
*Certificate required
- Demand Response Registration User Guide v 4.9 - clean10/27/2020, 11:11 AM
- Demand Response Registration User Guide v 4.9 - redline10/27/2020, 11:11 AM
- Structured Scenarios v1.5 - Energy Storage and Distributed Energy Resources Phase 209/17/2018, 4:41 PM
- Business Requirements Specification v 1.1 - Energy Storage and Distributed Energy Resources Phase 203/02/2018, 8:52 AM
Baseline accuracy work group material
- NOAA Station to Zip Mapping12/17/2019, 9:20 AM
- Example - Day Match Workbook12/04/2019, 3:03 PM
- Example - Weather Match Workbook12/04/2019, 3:03 PM
- 2017 Baseline Accuracy Work Group Final Proposal (Nexant)10/11/2018, 4:37 PM
- Stata Code to Validate Equivalence10/11/2018, 3:22 PM
- Example - Randomization Validation Template10/11/2018, 3:22 PM
- California ISO Baseline Accuracy Assessment (Nexant)08/15/2018, 2:17 PM
Baseline methodology templates
Please submit completed templates to PDR@caiso.com.
- Performance Methodology Form - Cover Page02/01/2024, 2:13 PM
- Performance Methodology Form - Day Matching 10-in-1007/17/2020, 2:52 PM
- Performance Methodology Form - EVSE Non-Residential with Customer Load Baseline06/22/2020, 1:26 PM
- Performance Methodology Form - EVSE06/22/2020, 1:26 PM
- Performance Methodology Form - EVSE Residential with Customer Load Baseline06/22/2020, 1:26 PM
- Performance Methodology Form - Load-Shift Resource with Customer Load Baseline06/19/2020, 2:34 PM
- Performance Methodology Form - Meter Generator Output With Customer Load Baseline06/19/2020, 2:34 PM
- Performance Methodology Form - Load-Shift Resource06/19/2020, 2:34 PM
- Performance Methodology Form - Meter Generator Output11/12/2019, 4:12 PM
- Performance Methodology Form - Meter Generator Output With 10-in-1011/12/2019, 4:12 PM
- Performance Methodology Form - Day Matching 5-in-10 Residential-Only10/03/2018, 4:02 PM
- Performance Methodology Form - Weather Matching10/03/2018, 4:02 PM
- Performance Methodology Form - Statistical Sampling Template Attachment10/03/2018, 4:02 PM
- Performance Methodology Form - Day Matching Combined10/03/2018, 4:01 PM
- Performance Methodology Form - Control Group06/29/2018, 4:36 PM