ISO Logo
 
Market Notice
November 30, 2018

REQUESTED ACTION

Information Only

CATEGORIES

Market Operations

System Operations

Capacity Procurement Mechanism Designation on 11/28/18

SUMMARY

The California ISO issued an Exceptional Dispatch Capacity Procurement Mechanism (CPM) designation to STANIS_7_UNIT 1 for a non-system reliability need. The designation is effective Nov. 28, 2018.


MESSAGE

The ISO issued an Exceptional Dispatch CPM designation to address a non-system reliability need. The Exceptional Dispatch was issued to address a potential thermal overload on a 60kV line in the PG&E Area for the next contingency event.

 

The ISO has designated the capacity identified below effective Nov. 28, 2018 for a non-system reliability need. The CPM term is for 60 days under the tariff, subject to adjustment and the payment provisions set forth in the CPM tariff provisions.

 

Resource ID

MW

TAC Area

STANIS_7_UNIT 1

5.4

PGE

 

The ISO will provide a designation report in accordance with tariff section 43A.6.2. The report will be available on the ISO website at http://www.caiso.com/market/Pages/ReportsBulletins/Default.aspx , under the Capacity procurement mechanism heading.


CONTACT INFORMATION

Kalyani Abhyankar at kabhyankar@caiso.com

Engage with us!
isoball twitterball RSSball Facebookball YouTube
Daily Briefing
Sign up
for
Daily Briefing
ISO Today
Download
ISO Today
Flex Alerts
Sign up
for
Flex Alerts

California Independent System Operator | P.O. Box 639014 | Folsom, CA 95630 | United States