Skip Ribbon Commands
Skip to main content
Sign In

 

  • Participating transmission owner per unit costs process - archive
    The ISO Generator Interconnection Procedures (ISO Tariff Appendix Y Section 6) requires participating transmission owners to annually update and publish per unit costs for use during the current interconnection study cycle for estimating the cost of facilities required to interconnect generation. Per unit costs are used to develop the cost for reliability and delivery network upgrades and participating transmission owner’s interconnection facilities. The ISO annually publishes draft per unit costs to its website, holds a stakeholder meeting and allows stakeholders to comment on the draft costs. The ISO publishes the final costs in the March to April time frame. The schedule for this annual process is located in Appendix 5 of the interconnection procedures.
    • 2020 participating transmission owner per unit costs
    • 2019 participating transmission owner per unit costs
    • 2018 participating transmission owner per unit costs
    • 2017 participating transmission owner per unit costs
    • 2016 participating transmission owner per unit costs
    • 2015 participating transmission owner per unit costs
    • 2014 participating transmission owner per unit costs
    • 2013 participating transmission owner per unit costs
    • 2012 participating transmission owner per unit costs
    • 2011 participating transmission owner per unit costs
    • 2010 participating transmission owner per unit costs
    • 2009 participating transmission owner per unit costs